My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-08-27_REPORT - M1974086
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1974086
>
2018-08-27_REPORT - M1974086
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2021 2:45:29 PM
Creation date
8/28/2018 2:01:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974086
IBM Index Class Name
REPORT
Doc Date
8/27/2018
Doc Name Note
Slide Mitigation Report
From
APC
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
71, 14802 W 44`�' enue <br /> Golden,Colorado 80403 <br /> Office: 303-279-6611 <br /> Fax. 303-279-6216 <br /> Nvww.apc.us.com <br /> The Sigli of Qualhty <br /> August 27, 2018 <br /> Department of Natural Resources <br /> Division of Reclamation, Mining and Safety <br /> 1313 Sherman Street, Room 215 <br /> Denver, CO 80203 <br /> RE: Status Report; APC Construction Co — Ralston Quarry <br /> On Monday august 20`", we submitted a technical revision to the DRMS it was emailed and sent by <br /> mail with appropriate application and fee. <br /> We talked to Ground Engineering to verify that their soil testing, monitoring and required <br /> calculations were on track to provide our geotechnical report. Ground Engineering also sent a <br /> representative to the site to monitor the test holes on Friday, August 24`h <br /> APC Construction did some onsite grading at the new fill area. Le'Vviki and Associates thought we <br /> should flatten the front of the fill to a 3 to l slope. We also did some minor grading for erosion <br /> control as well as checked our existing devices. <br /> On Friday, August 24th, APC was able to schedule a surveyor for the following week to establish <br /> elevation and position for the test holes and monitoring stakes. <br /> All the slopes continue to show good stability. <br /> Thanks, <br /> Stanley C. Opperman <br /> Vice President--Operations <br /> APC Construction Co., LLC <br /> > � ,� NAPA <br />
The URL can be used to link to this page
Your browser does not support the video tag.