My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-07-30_REPORT - M1974086
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1974086
>
2018-07-30_REPORT - M1974086
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2021 2:40:50 PM
Creation date
7/31/2018 4:02:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974086
IBM Index Class Name
REPORT
Doc Date
7/30/2018
Doc Name Note
Slide Response Report
From
APC
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
71, <br /> 14802 W 44`�'Avenue <br /> Golden,Colorado 80403 <br /> Office: 303-279-661 1 <br /> Fax: 303-279-6216 <br /> www.apc.us.com <br /> The Sign of Quality <br /> July 30, 2018 <br /> Department of Natural Resources <br /> Division of Reclamation, Mining and Safety <br /> 1313 Sherman Street, Room 215 <br /> Denver, CO 80203 <br /> RE: Status Report; APC Construction Co — Ralston Quarry <br /> On Monday July 23"', APC received a certified letter from Division of Reclamation, Mining and <br /> Safety. The letter contained two citations and a description based on Mr. Scott's understanding of the <br /> situation. We are working on a response to provide the Mine Land Reclamation Board prior to the <br /> hearing. <br /> Based on the recommendation of Ground Engineering on Monday, the 23 d we started to move some <br /> additional loose material in the upper portion of the slide area. The operation consisted of several <br /> days of dozing lose material down to native ground and then picking it up with scrapers and moving <br /> it out of the slide area. During this week we had a number of rain falls so we have noted increased <br /> water activity in our potholes and trenches and some settling of existing material in the slide area. We <br /> expect this grading operation to be complete by Friday, July 27th. <br /> On Thursday, July 26`', Ground Engineering sent a geologist to the site. Ground's first visit included <br /> two professional engineers that reviewed the site. This visit was for additional site monitoring, <br /> evaluation of the additional grading work, and putting a plan in place for drilling locations. Ground <br /> engineering is scheduling the drilling which may be accomplished during the week of July 30`" <br /> Ground engineering has estimated that their report and recommendations will be available in <br /> approximately three weeks. <br /> Thanks, <br /> ki e. qez,� <br /> Stanley C. Opperman <br /> Vice President—Operations <br /> APC Construction Co., LLC <br /> %UWr <br /> > NAM <br /> h1/0b'i <br />
The URL can be used to link to this page
Your browser does not support the video tag.