My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-07-23_REVISION - M2001005
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001005
>
2018-07-23_REVISION - M2001005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:15:14 PM
Creation date
7/23/2018 4:00:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001005
IBM Index Class Name
REVISION
Doc Date
7/23/2018
Doc Name
Request for Technical Revision
From
Continental Materials
To
DRMS
Type & Sequence
TR3
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M-2001-005 TR03 REeltlfL® <br /> COMPLIED! <br /> NO PRIOR VIOLATIONS! <br /> tc 1, mac <br /> COLORADO DIVISION OF RECLAMATION,-NIINING AND SAFETY <br /> 1313 Sherman Street,Rootu 215.Denver.Colorado 80203 ph(303)866 3.567 <br /> �87ej/ <br /> REQUEST FOR TECHNICAL REVISION (TR)COVER SHEET <br /> File No.:11I- 2001-005 Site Nanie:G rise nti Farms Gravel Pit <br /> County Fremont TR# (DPL US Use on42 <br /> Permittee:Continental Materials Corporation <br /> Operator(If Other than Permittee):Transit MIX Concrete Co. <br /> Permittee Representative:Mr. Brandon Heser, Transit Mix Concrete Co.(719) 313-0316 <br /> Please provide a brief description of the proposed revision: <br /> Proposal to install erosion protection along approximately 415 feet of the riverbank which is <br /> being eroded. <br /> As defined by the Minerals Rules,a Teel Revision(TR)is:"a change in the permit or application <br /> which does not have more than a ninon effoct on the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this defurition. If the Division determines that the proposed revision is beyond the scope of a TR. <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days.If the Division requires additional information to approve a <br /> TR.you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> perrnittee requests additional time.in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR:however.it is up to the per ittee to provide <br /> sufficient information to the Division to approve the TR request,including updated mining and <br /> reclamation plait neaps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Tvne Required TR Fee Submitted(mark only one) <br /> 110c. 111. 112 constriction materials,acid 112 quarries $216 I� <br /> 112 hard rock(not DMO) 5 t,� ❑ <br /> 110d, 112d(l.2 or 3) t006 ❑ <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.