My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-06-28_HYDROLOGY - M2008082
>
Day Forward
>
Hydrology
>
Minerals
>
M2008082
>
2018-06-28_HYDROLOGY - M2008082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2018 9:04:52 AM
Creation date
7/6/2018 9:01:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008082
IBM Index Class Name
Hydrology
Doc Date
6/28/2018
Doc Name
Substitute Water Supply Plan
From
DWR
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Office of the State Engineer <br />1313 Sherman Street, Room 821, Denver, CO 80203 P 303.866.3581 <br />www.water.state.co.us <br />John W. Hickenlooper <br />Governor <br /> <br />Robert Randall <br />Executive Director <br /> <br />Kevin G. Rein, P.E. <br />Director/State Engineer <br /> <br /> <br /> <br /> <br /> <br />June 28, 2018 <br /> <br />Ms. Jennifer S. Lindahl, P.E. <br />Bishop-Brogden Associates, Inc. <br />333 West Hampden Avenue, Suite 1050 <br />Englewood, Colorado 80110 <br /> <br /> <br />Re: Ready Mixed Concrete Substitute Water Supply Plan (WDID 0202616) Amendment <br /> Morton-Holton Lakes Mine DRMS File No. M-2008-082 (WDID 0203053) <br /> SWSP Plan ID: 5178 <br /> Sections 1 and 12, T1N, R67W of the 6th P.M. <br /> Sections 6 and 7, T1N, R66W of the 6th P.M. <br /> Water Division 1, Water District 2, Weld County <br /> <br />Approval Period: March 13, 2018 through December 31, 2018 <br />Contact phone number for Ms. Lindahl: (303) 806-8952 <br />Contact Email address for Ms. Lindahl: jlindahl@bbawater.com <br /> <br />Dear Ms. Lindahl: <br />We have reviewed your letter dated March 12, 2018 and the additional information from April <br />20, 2018, May 18, 2018, and June 27, 2018 requesting a substitute water supply plan (“SWSP”) <br />amendment to the current SWSP approved on November 21, 2017 (3rd SWSP amendment) to cover <br />mining operations from October 1, 2017 through December 31, 2018. The SWSP will cover <br />depletions caused by gravel mining operations at Morton Lakes Mine (“Morton Lakes”) and Holton <br />Lake Mine (“Holton Lakes”) operated by Ready Mixed Concrete Company (“RMCC” or Applicant”). <br />On March 6, 2017 the Colorado Division Mining and Safety (“DRMS”) approved the incorporation of <br />the Holton Lakes Mine into the Morton Lakes Mine, therefore both mining permits are now <br />operating under Morton Lakes Mine (M-2008-082). <br />The original SWSP for the Morton Lakes and Holton Lakes was approved on June 8, 2016 to cover <br />depletions from April 1, 2016 through December 31, 2017. The SWSP was amended on October 25, <br />2017 to cover changes from October 1, 2016 through December 31, 2017. The SWSP was amended <br />again on June 28, 2017 to cover changes from May 1, 2017 through December 31, 2017 and again <br />on November 21, 2017 to cover changed mining operations from October 1, 2017 through <br />December 31, 2018. In the current SWSP, RMCC had planned to continue dewatering Stage 6B <br />through the end of 2018. However, RMCC partially filled Stage 6B by direct diversions from the <br />South Platte River under free river conditions in March 2018. Therefore this fourth SWSP <br />amendment is intended to cover the additional evaporation depletions from Stage 6B from March <br />1, 2018 through December 31, 2018. Approval of this SWSP amendment supersedes the third <br />amendment approved on November 21, 2017. The required fee of $257 for this SWSP has been <br />submitted (receipt nos. 3685237). <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.