Laserfiche WebLink
<br /> <br /> <br /> <br /> <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br /> <br /> COAL MINING PERMIT - TECHNICAL REVISION DECISION <br /> Bowie No. 1 Mine, Bowie Resources, LLC <br /> Permit No. C-1981-038 <br /> <br />The Division of Reclamation, Mining and Safety has proposed the decision stated below. Provided <br />there are no objections, the decision will become effective upon the termination of the ten (10) day <br />public comment period, in accordance with Rule 2.08.4(6)(b)(iii). <br /> <br />Technical Revision No. 63 Decision: Approve <br />Submittal Date: January 22, 2018 Decision Date: April 25, 2018 <br />Description of Revision: Revise Revegetation Success Standard <br /> <br /> <br />DIVISION OF RECLAMATION, MINING AND <br />SAFETY <br />PERMITTEE <br /> <br /> <br /> <br /> <br /> <br />Authorized Representative - Division Authorized Representative - Permittee (if applicable) <br /> <br />Date: April 25, 2018 <br /> <br />Date: <br /> <br />CHANGE IN ACREAGE REVISED TOTAL ACREAGE PERFORMANCE BOND <br />Disturbed: 0.00 Disturbed: 156.10 Prior Liability: $2,779,202.33 <br />Affected: 0.00 Affected: 2,999.00 Change in Liability: $0.00 <br />Permit: 0.00 Permit: 5,035.20 Revised Liability: $2,779,202.33 <br />State: 0.00 State: 0.00 Bond Held: $3,315,000.00 <br />Federal: 0.00 Federal: 1,466.00 <br />Private: 0.00 Private: 3,569.20 <br />County: 0.00 County: 0.00 <br /> <br />REVISED APPLICATION PAGES REVISED MAPS <br />Section 2.05.4 pgs. 74a and 75, <br />Vol. 9A Table of Contents, Vol. 9A Phase III Bond <br />Release Success Standards-2017 p. 1,2 &3, Vol. 9A <br />Harner and Associates July 1986 Report -pg. 6, <br /> NA