Laserfiche WebLink
• <br /> lipce <br /> LAR Y E.FOUNDERO' RIAN ,IAN 8 i�r�� 7985 VANCE DRIVE,SUITE 205A <br /> ARVADA,COLORADO 80003 <br /> STEVAN L.O'BRIAN DIVIANOFRECLAMATION 303-423-7297 <br /> PRESIDENT MININQANQ SAFETY FAX 303-423-7599 <br /> January 18, 2018 <br /> Mr. Elliot Russell <br /> Division of Reclamation, Mining and Safety <br /> 1313 Sherman St, Suite 215 <br /> Denver, CO 80203 <br /> Dear Elliot <br /> Re : Summit Brick and Tile Company - Fox No 1 Clay Pit <br /> Permit # M-1977-219 - Adequacy Response #3 <br /> On behalf of our client Summit Brick and Tile Company, I will <br /> respond to your second adequacy review letter dated January8, 2018 <br /> in the order and number format presented in that document . I have <br /> added each point to be addressed from your letter so when reviewing <br /> our response one does not have to keep referring back to your <br /> adequacy letter. <br /> EXHIBIT D - Mining Plan (Rule 6.4.4): <br /> 55. In response to Adequacy Item#45, the Applicant provided a revised and updated Blasting Plan in <br /> accordance with Rule 6.4.4(i) and Rule 6.5(4). The Division has reviewed the new submittal and <br /> provides the following inadequacies: <br /> Attached is the revised Blasting Plan addressing the <br /> items 55 . 1 thru 55 . 12 . If needed additional information <br /> is provided under that section. <br /> 55.1 The Applicant did not provide a pre-blasting survey plan in the Blasting Plan. Please <br /> provide the Division a copy of the pre-blasting survey plan. <br /> 55.2 The Applicant did not provide a flyrock control plan in the Blasting Plan. Please provide <br /> the Division with a plan to control flyrock from damaging nearby permanent man-made <br /> structures. <br />