Laserfiche WebLink
RECEIVED <br /> - =' <br /> � C <br /> • DSP(, 0 72017 Page2of3 <br /> r1"-I Ir N OF RECLAMATION, 110(2) Annual Report <br /> iit"Kl ° MINERALS <br /> Permittee Name: ur r Benham Permit Number: M-1984-039 <br /> Operation Name: Toltec No 2 County: San Juan <br /> Annual Fee Due: $259.00 Anniversary Date: April 2015 ) <br /> Permit Acreage: 8.00 Current Bond Amt: $2,500. <br /> According to C.R.S. 34-32.5-116 or 34-32-116, each year,on the anniversary date of the permit, an operator shall submit <br /> the Annual Fee,an Annual Report and Map showing the extent of current disturbances to affected land,required <br /> monitoring information,reclamation accomplished to date and during the preceding year, any new disturbance that is <br /> anticipated to occur during the upcoming year,any reclamation that will be performed during the upcoming year,the <br /> dates for the beginning of active operations, and the date active operations ceased for the year. <br /> Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br /> inspection of the site. If,while completing this report,you learn that your site is not in compliance with the rules and the <br /> act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br /> 1. Is the site identification sign posted in accordance with Rule 3.1.12(1). CYTE--S2NO <br /> 2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). NO <br /> 3. Is the mine site in final reclamation(all material extraction and stockpile removal is complete)? YES O <br /> If"YES,"please note time limits related to completion of reclamation,Rule 3.1.3. <br /> 4. What was the date of last excavation,processing or hauling activity at the mine? g-,.7 -Z 0 o d <br /> 5. Does the mine operate more than 180 days per year YES <br /> If"NO",please review Rule 1.13 to assure that your mine is in compliance. <br /> 6. Has this mine been granted: a)approval of TEMPORARY CESSATION Status? YES NO <br /> b) approval for INTERMITTENT OPERATION? ES NO <br /> 7. Number of acres currently affected(mining+incomplete and or unreleased reclamation). g/ <br /> 8. Number of acres that were newly affected during the current report year. g <br /> 9. Number of acres that were reclaimed during the current report year. 3 <br /> 10. Estimated new acreage to be affected in the next report year. <br /> 11. Estimated acres to be reclaimed in the next report year. ,3 <br /> 12. Total acres in various stages of reclamation, since permitted mining activities began: <br /> Total acres Total acres Total acres Total acres <br /> backfilled: 2 seeded w/ Q w/topsoil mulched w/ LJ approved mix: replaced: approved mulch: <br /> Total acres Total acres Topsoil Mulch application <br /> graded: fertilized w/ replacement rate(tons): <br /> apvd fertilizer: depth(in.): V <br /> Seed FertilizerMulch <br /> application application V application CJ <br /> method: -.._3method: method: <br />