My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-11-15_REPORT - M2001056
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2001056
>
2017-11-15_REPORT - M2001056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2017 3:02:56 PM
Creation date
11/16/2017 8:30:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001056
IBM Index Class Name
REPORT
Doc Date
11/15/2017
Doc Name
Annual Fee/Report/Map
From
Elbert County
To
DRMS
Annual Report Year
2017
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Pi,ffe3 Off <br /> TRW IIIMMIEWIrapiena <br /> V1 lit I <br /> t0 <br /> Permit Alma= I W2.001-456 1 <br /> 9 tTaiArecirtamc 3'EllbatiLsek <br /> RECEIVED ,_.. <br /> Anniversary Date: November 9,2017 <br /> DIVISION Op MLA, 'TION' Current Bond Amt: $0.00 <br /> ': '` .,i 'T Annual Fee Due: $323.00 <br /> Permit Acreage: 9.60 <br /> (DRMS Office Use Only) PS <br /> DRMS Specialist PSH <br /> According to C.R.S. 34-32.5-116 or 34-32-116, each year, on the anniversary date of the permit, an operator shall submit <br /> the Annual Fee,an Annual Report and map showing the extent of current disturbances to affected land,required monitoring <br /> information, reclamation accomplished to date and during the preceding year, any new disturbance that is anticipated to <br /> occur during the upcoming year, any reclamation that will be performed during the upcoming year, the dates for the <br /> beginning of active operations, and the date active operations ceased for the year. <br /> Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br /> inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br /> act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br /> 1. Is the site identification sign posted in accordance with Rule 3.1.12(1)? 0 <br /> 2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2)? ONO <br /> 3. Is the mine site in final reclamation(all material extraction and stockpile removal is complete)? YES NO <br /> If"YES,"please note time limits related to completion of reclamation, Rule 3.1.3. <br /> 4. What was the date of last excavation,processing or hauling activity at the mine? 7- /5-/7 <br /> 5. Does the mine operate more than 180 days per year YES NO <br /> If"NO",please review Rule 1.13 to assure that your mine is in compliance. <br /> 6. Has this mine been granted: a)approval of TEMPORARY CESSATION Status? NO <br /> b)approval for INTERMITTENT OPERATION? NO <br /> 7. Number of acres currently affected(mining+incomplete and or unreleased reclamation): ', 6"g <br /> 8. Number of acres that were newly affected during the current report year: Q /kcite 5 <br /> 9. Number of acres that were reclaimed during the current report year: 0 A<.R.E5 <br /> 10. Estimated new acreage to be affected in the next report year: 0 aCf.ES <br /> 11. Estimated acres to be reclaimed in the next report year: 0 fCRES <br /> 12. Total acres in various stages of reclamation, since permitted mining activities began: <br />
The URL can be used to link to this page
Your browser does not support the video tag.