My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-09-08_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2017-09-08_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2017 6:45:21 AM
Creation date
9/12/2017 1:25:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
9/8/2017
Doc Name Note
(Site BK-1-072617)
Doc Name
Preliminary Datat Recovery Report
From
Tri-State Generation and Transmission Association, Inc.
To
DRMS
Email Name
ZTT
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/12/2017 State.co.us Executive Branch Mail - Re: Site BK -1-072617 - Preliminary Data Recovery Report <br />STATE OF DRMS_CoalAdmin - DNR, DNR <dnr_drms_coal_admin@state.co.us> <br />COILORAII 1O1 <br />Trujillo - DNR, Zach <zach.trujillo@state.co.us> Fri, Sep 8, 2017 at 1:21 PM <br />To: "Tennyson, Tony (Colowyo)" <ttennyson@tristategt.org> <br />Cc: DNR DRMS_CoalAdmin - DNR <dnr—drms—coal—admin@state.co.us> <br />Tony, <br />Attached is the Division's letter regarding the post discovery analysis performed by the Colowyo Mine, C-1981-019, for <br />the Cultural Resource Site BK -1-072617. If you have any question, feel free to contact me. <br />Sincerely, <br />On Fri, Sep 8, 2017 at 1:11 PM, Tennyson, Tony (Colowyo) <ttennyson@tristategt.org> wrote: <br />Zach, <br />Per our meeting we had some time back to with OSMRE, yourself and Tri-State to discuss the Historic Properties <br />Treatment Plan (HPTP) for site BK -1-072617, it was determined that we could submit a preliminary data report once <br />mitigation on the ground was complete. This preliminary report if agreed upon by all agencies would allow Colowyo to <br />recommence construction of the Collom Haul Road within the 100' buffer zone established for site BK -1-072617. That <br />being said, Tetra Tech has finished the excavation work and data collection on the ground. I have attached the <br />preliminary report for your review. <br />As stated in the report, the field portion of the HPTP for this site has been completed and all data potential at the site <br />has been exhausted. We would like to begin construction in that area again, but we will not recommence ground <br />operations until approval has been granted from the Division. <br />I would appreciate a timely review as operations would like to restart working in that area next week. If you have <br />questions please give me a call. <br />Tony Tennyson <br />Senior Environmental Engineer <br />Tri-State Generation and Transmission Association, Inc. <br />Office: 970.824.1232 <br />ttennyson@tristategt.org <br />lrAP Please consider the environment before printing this email. <br />https://mail.google.com/mail/b/AAYagpWYg7Fffl5nGdXzkVBGbbrei6Dp-VUUFy8jjoRSwOFeaKPb/u/0/?ui=2&ik=deb7fOcd20&jsver=6H9snhMgLA8.en.&... 1/2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.