Laserfiche WebLink
Purr 3 c,1'5 <br /> 112c Annual <br /> Report <br /> Permit Number: NI-2000-052 <br /> Permittee Name: Rocky Mountain Materials and <br /> RECEIVED <br /> Asphalt. Inc. <br /> Operation Name: Coyote Ridge <br /> AUG Z 5 20`1 1 <br /> C OLIMN: Fremont <br /> DIVISION Or REC IN ATION, Anniversary Date: September 11.2017 <br /> M " ' LS <br /> FEE -PO MAP Current Bond Amt: $6.1.800.00 <br /> Annual lee Due: 5791.00 <br /> (DRNIS Office Use Only) Permit Acreage: 'g <br /> DR\is Specialist N TCl <br /> According to C.R.S. 3.1-32.5-116 or 34-32-116, each ycar, on the anniversary date of the permit,an operator shall submit <br /> the Annual Fee,an Annual Report and Map showing the extent of current disturbances to affected land, required monitoring <br /> information,reclamation accomplislied to date and during the preceding year,any ne-,v disturbance that is anticipated to occur <br /> during the upcoming year. an), reclamation that will be performed during the upcoming year, the dates for the beginning <br /> of active operations,and the date active operations ceased for the year. <br /> Information contained in this report ,vill be reviewed by the Division upon receipt and prior to the next compliance <br /> inspection of the site. If.«bile completing this report, you learn that your site is not in compliance with the rules and the <br /> act. it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br /> 1. Is the site identification sip ri posted in accordance with Rule 3.1.12(l)'? "ES NO <br /> 2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2)'? 'ES NO <br /> 3. Is the mine site in final reclamation(all material extraction and stockpile removal is complete)'? YES NO <br /> I f"YES,"please note time limits related to completion of reclamation, Rule 3.1.3. <br /> 4. What was the date of last excax ation, processing or hauling activity at the mine'? .Ianuary 15_2015 <br /> 5. Does the mine operate more than 180 days per year'? YES FNOJ <br /> If"NO". please review Rule 1.13 to assure that your mine is in compliance. <br /> 6. Has this mine been granted: a)approN al of TEMPORARY CESSATION Status'? P <br /> NO <br /> b)approval for INTI:RN,II(TENT OPERATION'? 0 <br />