Laserfiche WebLink
p4/Cplp. <br /> - - COLORADO DIVISION OF RECLAMATION MINING AAgJAFETY <br /> * 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 <br /> 7 ��•��[ <br /> �g R <br /> � 6 <br /> REQUEST FOR TECHNICAL REVISION (TR)COVER SHF,ET AUG Z017 <br /> File No.: M- 20 13 09 Q Site Name: (JpD7­-zAUD CLAim C M C AFETY <br /> County ` —OL ]e TR# ORMS Use only <br /> T_ <br /> Permittee:l CL-&J4 P 1-R��D ✓COMPLIED! <br /> Operator(If Other than Permittee): -'No Violations <br /> ERR <br /> Permittee Representative: WHF <br /> Please provide a brief description of the proposed revision: ]�ITS :TR is T-a <br /> APPRo Vk- foB m ljmWo A ser.ML? Ar-fF ui ttffi l THc AeP& V�c_!? <br /> c9u R�✓ <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review" until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted(mark only one) <br /> I IOc, 111, 112 construction ❑ <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) S 175 ❑ <br /> I 1 Od, 112d(1, 2 or 3) $1006 ❑ <br /> 110(1).110(2) None ERR <br />