Laserfiche WebLink
THM GRIM <br />M-1978-091 UG TR03 <br />Yr Annual Fee/Reporr CW <br />J Vlolatlons <br />MVI 994003 1/213A 994 AS 4/26/1994 <br />MV1994004 1/25/1994 AS 6/13/1994 <br />MV2008o09 8/1312008 RE 8/25/2008 <br />Rec _ <br />JUS 2 d -4 U <br />DMe�oNofi�F <br />OF RECLAMATION, MINING Afq <br />215, Denver, Colorado 80203 ph(303) 866-3567 <br />REQUEST FOR TECHNICAL REVISION „(TRI COVER SHEET <br />File No.: M- 1978 -091 -UG <br />Site Name: Golden Wonder Mine <br />County Hinsdale TR# (DBMS Use ontly <br />Permittee: LKA International, Inc. <br />Operator (If Other than Permittee): <br />Permittee Representative: Kye Abraham <br />Please provide a brief description of the proposed revision: Minor improvements/enhancements <br />to existing mine water treatment system. Replacing limestone in passive system with more effective materials <br />and adding a small pre-treatment sump on edge of existing mine pad. No additional acreage will be disturbed. <br />As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br />which does not have more than a minor effect upon the approved or proposed Reclamation or <br />Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br />meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br />the Division may require the submittal of a permit amendment to make the required or desired changes <br />to the permit. <br />The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br />Division (as listed below by permit type). Please submit the appropriate fee with your request to <br />expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br />determine if it is approvable within 30 days. If the Division requires additional information to approve a <br />TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br />day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br />permittee requests additional time, in writing, to provide the required information. <br />There is no pre -defined format for the submittal of a TR; however, it is up to the permittee to provide <br />sufficient information to the Division to approve the TR request, including updated mining and <br />reclamation plan maps that accurately depict the changes proposed in the requested TR. <br />Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br />your request for a Technical Revision. <br />F <br />Permit Type <br />1 l Oc, 111, 112 construction <br />materials, and 112 quarries <br />112 hard rock (not DMO) <br />110d, 112d(1, 2 or 3) <br />Required TR Fee <br />$216 <br />$175 <br />$1006 <br />E4t"jA__-. T <br />Submitted (mark only one) <br />11 <br />