Laserfiche WebLink
• COLORADO <br />Division of Reclamation, <br />Mining and Safety <br />Department of Natural Resources <br />1313 Sherman St. Room 215 <br />Denver, CO 80203 <br />Notice of 111 Construction Materials <br />Reclamation Permit Release Request Consideration <br />DATE: July 25, 2017 <br />TO: Castle Rock Construction Company of Colorado, LLC <br />6374 S. Racine Circle <br />Centennial, CO 80111 <br />FROM: Timothy A. Cazier, Environmental Protection Specialist Wow <br />RE; Castle Rock Construction Company of Colorado, LLC, <br />Vick Borrow Pit, Permit No. M-2010-048 — SL01 <br />Please be advised that on July 21, 2017, Castle Rock Construction Company of Colorado, LLC, whose <br />address and telephone number are 6374 S. Racine Circle, Centennial, CO 80111; (303) 688.6611, <br />submitted a request for full reclamation responsibility release for the Vick Borrow Pit, Permit No. M-2010- <br />048. The construction materials extraction operation is located at or near Section 33, Township 11 S, Range <br />53W, 61 Principle Meridian, in Lincoln County. <br />Written comments or objections to the release may be submitted to, and additional information obtained <br />from, the Division of Reclamation, Mining and Safety, 1313 Sherman Street, Room 215, Denver, Colorado <br />80203, (303) 866-3567. Comments or objections should be submitted within 15 days. The Division is <br />required to wait 30 days after the release decision is made to allow for appeals. <br />att90MOa <br />1313 Sherman St. Room 215 Denver, CO 80203 P (303) 866.3567 F <br />John W. Hickenlooper, Governor i Robert W. Randall, Executive Director ( Virginia Brannon, Director <br />