My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-06-06_REVISION - M2001060
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001060
>
2017-06-06_REVISION - M2001060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:08:15 PM
Creation date
6/7/2017 12:30:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001060
IBM Index Class Name
Revision
Doc Date
6/6/2017
Doc Name
Request for Technical Revision
From
3B Enterprises
To
DRMS
Type & Sequence
TR2
Email Name
ACY
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO DIVISIO& OF JRECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203 ph(303) 866-3567 1 !� <br />REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br />File No.: M- Zo01 D Site Name:— <br />,: 4 8��,,4t <br />County �� c ���C� TR# ( Ba se only) <br />Permittee: _ nTR02 <br />✓ Complied ®��a <br />Operator (If Other than Permittee): ✓ / <br />0 Violations: <br />Permittee Representative: 5�-t k-��' ACY �+ <br />Please provide a brief description of the proposed revision: ,I,&L& vJ�--k i <br />'I +n'1 '�� n n -e <br />0620,, <br />Mil , ,r <br />As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br />which does not have more than a minor effect upon the approved or proposed Reclamation or <br />Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br />meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br />the Division may require the submittal of a permit amendment to make the required or desired changes <br />to the permit. <br />The request for a TR is not considered Wiled for review's until the appropriate fee is received by the <br />Division (as listed below by permit type). Please submit the appropriate fee with your request to <br />expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br />determine if it is approvable within 30 days. If the Division requires additional information to approve a <br />TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br />day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br />permittee requests additional time, in writing, to provide the required information_ <br />There is no pre -defined format for the submittal of TR; however, it is up to the permittee to provide <br />sufficient information to the Division to approve the TR request, including updated mining and <br />reclamation plan maps that accurately depict the changes proposed in the requested TR- <br />Required <br />R <br />Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br />your request for a Technical Revision. <br />Permit Type Reguired TR Fee Submitted (mark only one) <br />1 IOc, 111, 112 construction <br />materials, and 112 quarries $216 <br />112 hard rock (not DMO) $175 ❑ <br />110d, 112d(1, 2 or 3) $1006 ❑ <br />
The URL can be used to link to this page
Your browser does not support the video tag.