My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-18_REVISION - M1978091UG (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978091
>
2017-05-18_REVISION - M1978091UG (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:15:11 PM
Creation date
5/19/2017 9:02:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978091UG
IBM Index Class Name
Revision
Doc Date
5/18/2017
Doc Name
Request for Technical Revision
From
LKA Int'l., Inc.
To
DRMS
Type & Sequence
TR3
Email Name
THM
GRM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THM GRM <br /> M-1978-091 UG TR03 <br /> J Annual Fee/Report: CW <br /> J Violations <br /> MV1994003 1/26/1994 AB 4/26/1994 <br /> MV1994004 1/26/1994 AB 6/13/1994 OF RECLAMATION,MINING AND SAFETY <br /> MV2008009 8/13/2008 RE 8/25/2008 215,Denver,Colorado 80203 ph(303)866-3567 <br /> REQUEST FOR TECHNICAL REVISION(TR)COVER SHEET <br /> File No.:M- 1978-091-UG Site Name: Golden Wonder Mine <br /> County Hinsdale TR# RECEIVED (DBMS Use only) <br /> �;- Permittee: LKA International, Inc. MAY 18 2917 <br /> Operator(If Other than Permittee): n119N 8; �;6WA;l^N <br /> Permittee Representative: Kye Abraham MINING AND SAFETY <br /> Please provide a brief description of the proposed revision: Minor improvements/enhancements <br /> to existing mine water treatment system. Replacing limestone in passive system with more effective materials <br /> and adding a small pre-treatment sump on edge of existing mine pad. No additional acreage will be disturbed. <br /> As defined by the Minerals Rules,a Technical Revision(TR)is:"a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days.If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time,in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR;however,it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request,including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted(mark only one) <br /> 1 1Oc, 111, 112 construction <br /> materials,and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 <br /> I IOd, 112d(l,2 or 3) $1006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.