Laserfiche WebLink
\ \, Spillway Details <br /> 2' IN SPILLWAYS <br /> �S� 2 1' IN CHANNELS <br /> 2 <br /> ,.MIN v �` <br /> .+y <br /> THICK FILTER LAYER 2" DEC - <br /> r THICK RIP RAP LAYER 6" D50 0 0 "THICK FILTER LAYER 2' D50 <br /> A, Scale: 1" _ FO FILTER FABRIC 2 <br /> -1117 11'ji: r ,' \ E} - CUT OFF/WING WALLS13.5"THICK RIP RAP LAYER 9" D50 <br /> r„xj 5'yE�xisting Contours WILL PREVENT SEEPAGE 0.75' H FLUME <br /> J PH18,111t �' LYP.SI CT-COntOLFrS OUTSIDE OF FLUME FILTER FABRIC <br /> t \\ ry SECTIONELTEER DISCHARGE POND FLUME <br /> g SECTION A-A' <br /> }r. DISCHARGE POND ON EMBANKMENT <br /> rl lr l /N r)} 1t1 Se ,t EMERGENCY SPILLWAY ME AND <br /> t <br /> d,t rri It at'trl+rif}' @off �- 2' IN SPILLWAYS <br /> 1' IN CHANNELS <br /> �flli 'ri� <br /> oa I•r l" <t 1 i MA2 <br /> „MIN <br /> k 1 <br /> a 2"THICK FILTER LAYER 2" D50 <br /> IC <br /> 3"THK 2" D50 WHERE NECESSARY -+ , _u <br /> /jr( rt! l/�tCt' rr�i/1 l�ti� , '-i-{:, rt�.�tiT, ��� THICK RIP RAP LAYER 6" D50 <br /> 1{i' '+ +r}1 /rr r r +/+ SECTION Ci-C. ` FILTER FABRIC <br /> - `� / t/ l I7pE ti; MILD SLOPE EXISTING CHANNELS <br /> BETWEEN PONDS SECTION D-D' <br /> t t e1} TYPICAL SPILLWAY AND CHANNEL AT <br /> I SETTLING POND AND LARGE PONDS <br /> 1t}��rli� : jll llilir W}-�_ + _ <br /> L <br /> �.- <br /> 1 <br /> I � , <br /> NOTES: <br /> 1. Prior to an NPDES discharge point being approved for this facility the water levels will be maintained <br /> sufficient to contain a 100-yr 24-hr storm event. This equates to the full volume of the lowest pond (Pond 4) <br /> ,l or 6 of storage in the next to lowest pond (Pond 3). <br /> 2. The pond system is designed to function properly if built is stages. The first stage will be the construction of <br /> Ponds 3, 4, and 5. <br /> AA <br /> + <br /> ` x � �--R--� x x <br /> x x \ x <br /> x x <br /> f o\ <br /> 'cP <br /> Pond Embankment Cross Sections <br /> 111= 10' <br /> TOP FLU: 5605 <br /> SPILLWAY ELEV: 5603 <br /> 5680 __._ 5680 <br /> 5 610 _.._._ ____- TOP FLU. 5672 <br /> SPILLWAY FLU, 5671 <br /> I <br /> EMERGENCY SPILLWAY FLOW UNE 5675 5675 - <br /> ORIGINAL GROUND TOP FLU 5667 <br /> FINISHED POND EMBANKMENT <br /> PRIMARY SPILLWAY ELEV: 5665.16 <br /> --- - �-_ _� /FINISHED GROUND '--- -------.____ _ _-GORIGINALIGROUND 3 EIdERGENCY SPILLWAY ELEV: 5666 <br /> PRIMARY SPILLWAY FLOW LINE —7`-- --_ 5670 — 1 -- - 5670 - - <br /> _ / <br /> 5600 _ UME IF <br /> ___ N15HED POND EMBANKMENT <br /> ' I � lIORIGINPL GROUND _- 3 <br /> 5665 __.__ 5665 , <br /> 5595 _ I ----��- — <br /> 5590 -- 5660 5660 <br /> 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 +00 +10 +20 +30 +40 +50 +60 +70 0+00 0+10 0+20 0+30 0+40 0+50 0+00 0+10 0+20 0+30 0+40 0+50 <br /> SECTION F-F SECTION I-I' <br /> SECTION E-E' <br /> 5640 <br /> 5660 <br /> ,TOP ELEV: 5632 <br /> TOP ELEV: 5652 / SPILLWAY ELEV: 5630 <br /> / SPILLWAY ELEV: 5650 -/ -- <br /> / 5635 <br /> 5655 <br /> 5650 5630 A <br /> � _ /FlNISHED POND EMBANKMENT <br /> FlNISHED POND EMBANKMENT <br /> 5625 _—__ '-- ,�� ORIGINAL GROUND <br /> 5645 <br /> (ORIGINAL GROUND <br /> 5640 _ 5620 <br /> 5 <br /> 5615 <br /> 635 i <br /> 5630 561 0 <br /> 0100 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1 +00 1 +10 1 +20 1 +30 1 +40 1 +50 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1 +00 1 +10 1 +20 1 +30 1 +40 <br /> SECTION G-G' SECTION H-H' <br /> 5675 F <br /> CAI 43992 <br /> rylR-170 a 1 APR 0 4 2017 ��� 3/24�i7•° <br /> (FlNISHED POND EMBANKMENT :Approved 4/10/2017 <br /> 5670 w'Ks REDUCER 1)jvj51OnOfReClamation, <br /> MOOTH PLASTIC & <br /> Vt <br /> PIPE INLET ELEV: 5665.16 J 8" S SatBty '4"`a <br /> 3 PIPE ON SURFACE ng <br /> RADO <br /> 5665 PIPE THROUGH EMBANKMENT 3607 COUNTY <br /> MINE <br /> ORIGINAL caoueo BLUE MOUNTAIN ENERGY, INC. RANGELY O8164865 <br /> 5660 Title <br /> 5655 0+50 ® MAP 160 B Seam Dewatering System 2 <br /> 0+00 0+10 0+20 0+30 0+40 <br /> SECTION J-J' Deg location: C AEngineering ProjeetsVCC 88 Dewatering Systern0rawingswap 160-TR-70.dwg <br /> 1 Added Pond 5(Settling Pond)-Minor Revision MR170 3Y29/17 Dwg by: JILT Check by par. by. Scale Rev <br /> No. Revision Date Check by Date 10/4/16 Date Date <br /> as noted 0 <br />