My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-04-06_INSPECTION - M1980244 (2)
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1980244
>
2017-04-06_INSPECTION - M1980244 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2017 8:57:09 AM
Creation date
4/10/2017 8:36:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Inspection
Doc Date
4/6/2017
Doc Name
Response
From
Newmont / CC&V
To
DRMS
Email Name
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pp� <br />�EWMONT. RECEIVED <br />April 6, 2017 <br />APR 0 7 2017 <br />DIVISION OF RECLAMATION <br />MINING AND SAFETY <br />SENT CERTIFIED RETURN RECEIPT REQUESTED <br />7015-1660-0000-0779-8904 <br />Ms. Amy Eschberger <br />Environmental Protection Specialist <br />Colorado Department of Natural Resources <br />Division of Reclamation, Mining and Safety <br />Office of Mined Land Reclamation <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Newmont Mining Corporation <br />Cripple Creek & Victor Gold M n ng Company <br />100 N 3"' St <br />P.O. Box 191 <br />Victor, CO 80860 <br />www.newmont.com <br />Re: Permit No. M-1980-244: Cripple Creek _& Victor Gold Mining_ Comnanv ("CC&V" ): <br />Cresson Proiect; — Chicago Tunnel December 201_6 Inspection Response Rock Material <br />Sampling and Anal <br />Dear Ms. Eschberger, <br />Within the December 2016 DRMS inspection report received 9`h March 2017, it was found that <br />"The Operator has failed to follow the approved mining plan for this permit as revised by <br />Technical Revision No. 3 (TR -3). The Division's conditional approval of TR -3 required <br />geochemical analyses of material relocated from inside the adit to surface, as necessary to <br />determine whether the material is toxic or acid forming. The Operator has removed mine <br />development material from the adit and stockpiled it at the surface. However, the Division has no <br />evidence the Operator has conducted geochemical analyses of such material." <br />The inspection report required two corrective actions. The first, due 4.8117, is to sample rock <br />material removed from the Chicago Tunnel adit which is to be sent to a laboratory for analyses <br />of the material's toxic and acid producing capabilities. The second, due 717117, is to provide to <br />the Division the laboratory results of such analyses, include a report summarizing the results, <br />describing where the material will be moved to accordingly, and providing an estimated timeline <br />for completion. <br />The purpose of this correspondence is to demonstrate CC&V has completed the corrective <br />actions by collecting rock material samples and conducting proper chemical analyses. CC&V <br />believes this work demonstrates it is unlikely the rock material will adversely affect the <br />environment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.