Laserfiche WebLink
RECEIVED <br /> - / JUN 2. 3 2015 Page 2 of 3 <br /> DIVIS10ri Ot R-'-C AMATION, 110c Annual Report <br /> M&SAFETY LS <br /> —ffimm <br /> Permittee Name: MI?uVr7lbstruction Permit Number: M-2005-002 <br /> Operation Name: Schuler Construction Pit# County: : El Paso <br /> 1 <br /> Annual Fee Due: $323.00 Anniversary Date: ! June 24,2015 <br /> Permit Acreage: 9.90 Current Bond Amt: —7 $10,000.00 <br /> According to C.R.S.34-32.5-116 or 34-32-116, each year,on the anniversary date of the permit,an operator shall submit <br /> the Annual Fee,an Annual Report and Map showing the extent of current disturbances to affected land,required <br /> monitoring information,reclamation accomplished to date and during the preceding year,any new disturbance that is <br /> anticipated to occur during the upcoming year,any reclamation that will be performed during the upcoming year,the <br /> dates for the beginning of active operations,and the date active operations ceased for the year. <br /> Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br /> inspection of the site. If,while completing this report,you learn that your site is not in compliance with the rules and the <br /> act,it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br /> I. Is the site identification sign posted in accordance with Rule 3.1.12(1). YES NO <br /> 2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). ES NO <br /> 3. Is the mine site in final reclamation(all material extraction and stockpile removal is complete)? YES �O <br /> If"YES,"please note time limits related to completion of reclamation, Rule 3.1.3. nn <br /> 4. What was the date of last excavation,processing or hauling activity at the mine? <br /> 5. Does the mine operate more than 180 days per year? YES fo) <br /> If"NO",please review Rule 1.13 to assure that your mine is in compliance. <br /> 6. Has this mine been granted: a)approval of TEMPORARY CESSATION Status? NO <br /> b)approval for INTERMITTENT OPERATION? YES NO <br /> 7. Number of acres currently affected(mining+ incomplete and or unreleased reclamation). ' 1 <br /> 8. Number of acres that were newly affected during the current report year. <br /> 9. Number of acres that were reclaimed during the current report year. �--- <br /> 10. Estimated new acreage to be affected in the next report year. <br /> 11. Estimated acres to be reclaimed in the next report year. 9 <br /> 12. Total acres in various stages of reclamation, since permitted mining activities began: _ <br /> Total acres Total acres Total acres Total acres j <br /> backfilled: G seeded w/ w/topsoil ) mulched w/ j <br /> approved mix: replaced: approved mulch: <br /> Total acres ( 1Iotal acres Topsoil Mulch application <br /> graded: �i i fertilized w/ replacement rate(tons/ac): <br /> depth(in.):a vd fertilizer: _ X' <br /> Seed fertilizer Mulch r <br /> application application application /} <br /> method: method: method: �/ j <br />