Laserfiche WebLink
NEWMONT. <br />21 December 2016 <br />ROCENF-0 <br />DEC 2 3 2fl16 <br />i ff1l►►„` <br />Newmont Mining Corporation <br />100 N. 3fQ Street <br />PO Box 191 <br />Victor, CO 8088080111 <br />T 719-689-2977 <br />F 719-689-3254 <br />www. newmont,corn <br />SENT CERTIFIED, RETURN RECEIPT REQUESTED <br />7015-1660-0000-0779-8294 <br />Mr. Elliot Russell <br />Environmental Protection Specialist <br />Colorado Department of Natural Resources <br />Division of Reclamation, Mining and Safety <br />Office of Mined Land Reclamation <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: M-1980-244 Cresson Project August Inspection - Reguest for an extension to address <br />Problem # 3 Aregua Gulch Valley Leach Facility Edge of Liner Signage <br />Dear Mr. Russell: <br />Within the DRMS August inspection report received 21st November 2017, Problem 3 noted that <br />"Signs delineating the edge of the Arequa Gulch liner facility are missing and/or damaged". A <br />corrective action due date was specified as 21 December 2016, requiring CC&V to "provide the <br />division with photographic evidence that Edge of Liner Signs have been replaced before the <br />corrective action due date". <br />Due to a supply issue with the signage manufacturer, CC&V have been unable to meet the due <br />date specified within the inspection report and therefore request a 30 day extension to the <br />completion of this action, with the extended date being January 20, 2017. <br />Should you require further information please do not hesitate to contact me at (719}-689-4048 <br />or Cheyne.Manno_newmont.com. <br />Sincerely, <br />�.,,_ <br />Cheyne Mann <br />Senior Environmental Specialist <br />Cripple Creek and Victor Gold Mining Company <br />CRM <br />