My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-12-12_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2016-12-12_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2016 7:44:41 AM
Creation date
12/13/2016 6:55:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
12/12/2016
Doc Name
Concurrence Letter
From
OSM
To
DRMS
Type & Sequence
SL17
Email Name
MPB
BFB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
United States Department of the Interim - <br />3 <br />nterior3r OFFICE OF SURFACE MINING <br />Reclamation and Enforcement <br />Wcstcm Rcgion Ofticc <br />1999 Broadway. Suilc 3320 <br />Dower, CO 80202-3050 <br />DEC 05 2016 <br />Mike Boulay, Director aEG 122016 <br />Office of Mined Land Reclamation <br />Division of Reclamation, Mining and Safety piv�s;on of Red' ' <br />1313 Sherman Street, Room 215 Wk -l-1"19 " <br />Denver, CO 80203-2273 <br />RE: Approval of SI, -17 Phase III Bond Release, Trapper Mine, Permit No. C-1981-010 <br />Dear Mr. Boulay, <br />This letter acknowledges the Office of Surface Mining Reclamation and Enforcement (OSMRE), Denver <br />Field Division (DFD) receipt and review of the above Phase HI Bond Release Proposed Decision <br />document prepared by the Division of Reclamation Mining and Safety (DBMS) dated November 29, <br />2016. The Proposed Decision documents lite applicant's compliance with the approved Colorado <br />regulatory program at Rule 3.03.2. <br />This 448A acre Phase III bond release applies to portions of lite Trapper Mine south of Craig, Colorado, <br />which were reseeded in the 2001— 2005 timeframe. OSMRE and the Bureau of Land Management <br />participated in the bond release inspection held on July 6, 2016. By letter, dated December 2, 2016, the <br />BLM provided its concurrence with clic SL -17 bond release (attached). OSMRE interprets the BLM's <br />concurrence to mean that Trapper is in compliance with all BLM coal Icase stipulations. <br />OSMRE agrees with DRMS that Trapper has met or exceeded the requirements for Phase Ili bond release <br />on the 448.4 acres of land as described in DBMS Proposed Decision document. The Division currently <br />holds a performance bond in the amount of $23,400,000.00 for the Trapper Mine. DBMS proposes to <br />release $659,843.13 with this bond release action. OSMRE agrees with the findings and decision <br />document and hereby provides OSMRE concurrence for the above bond release action in accordance with <br />30 CFR 740.15 (d) (3), and 30 CFR 906.30, Article IX, Section 24, of the State-Fedcral Cooperative <br />Agreement. <br />Thank you and your staff for coordinating this Federal mine bond release action through the DFD. Please <br />direct any questions concerning this action to Christine Bolka, Senior Regulatory Program Specialist at <br />cbclka�g:OSM Rl�;oy or (303) 293-5020. <br />Alan Boehms, Chief <br />Denver Field Branch <br />Cc: f orrest Lukc, Trapper Mining Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.