Laserfiche WebLink
10/27/2016 State.co.us Executive Branch Mail - Re: SI -9; Liability Reduction Calculation, Roadside Mine, C-1981-041 <br />ObSTATE' E Hernandez - DNR, Alysha <alysha.hernandez@state.co.us> <br />COLORADO, <br />Re: SI -9; Liability Reduction Calculation, Roadside Mine, C-1981-041 <br />1 message <br />Ebert - DNR, Jared <jared.ebert@state.co.us> Thu, Oct 27, 2016 at 1:58 PM <br />To: Tonya Hammond <tonya.snowcap@bresnan.net> <br />Cc: Brock Bowles <brock.bowles@state.co.us>, Alysha Hernandez <alysha.hernandez@state.co.us> <br />Hello Tonya, <br />Based on our telephone conversation, I have updated the calculation so the releasable contingency cost is based on 3% <br />of the total direct cost and not based on the total direct cost plus overhead and profit. Attached is an updated document <br />depicting the calculation. Based on the updated calculation, the total releasable amount is $52,216.63. Please let me <br />know if you concur. <br />Thanks, <br />On Thu, Oct 27, 2016 at 10:12 AM, Ebert - DNR, Jared <jared.ebert@s tate. co.us> wrote: <br />Hello Tonya, <br />I have reviewed the bond reduction calculation included in the SI -9 application. Based on this and the observations <br />made during the bond release inspection, I have calculated the amount of liability the Division can release to be <br />$52,444.56. The attached document includes several tables that show how this number was calculated. Please <br />review the information and let me know if you concur or if you have any questions. <br />Thanks, <br />'A <br />303.866.3567 ext. 8120 ( F 303.832.8106 <br />jared.ebert@state.co.us I mining.state.co.us <br />https://mail.googl e.com/m ai I/u/0/?ui=2&i k=e29129fcb5&view=pt&search= i nbox&th=15807b8b26Od7e56&si m l=15807b8b26Od7e56 1/2 <br />