My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-09-09_PERMIT FILE - M2016026 (3)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2016026
>
2016-09-09_PERMIT FILE - M2016026 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2020 5:27:51 PM
Creation date
9/13/2016 10:05:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016026
IBM Index Class Name
Permit File
Doc Date
9/9/2016
Doc Name
Decision Extension Request
From
Elam Construction
To
DRMS
Email Name
ACY
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSTRUCTION,INC. <br /> c <br /> 556 Struthers Ave <br /> Grand Junction,CO 81501 <br /> (970)242 5370 Fax(970)245-7716 <br /> ElamConstruction.com <br /> RECEIVED <br /> September 6, 2016 CEP 0 9 2016 <br /> Mrs. Amy Yeldell DIVISION OF RECLAMATION <br /> Division of Reclamation, Mining and Safety MINING AND SAFETY <br /> Attention: Amy Yeldell <br /> 1313 Sherman Street, Room 215 <br /> Denver, CO 80203 <br /> RE: 5-Mile Pit, Letter Requesting Extension to Decision Date, No. 2. <br /> Amy, <br /> Elam Construction (Elam) would like to formally request an extension to decision date for the <br /> proposed mining operation M-2016-026 (5 Mile Pit). Elam proposes a due date that is non- <br /> conflicting with any other dates pertaining to the formal process of the permit review. Elam <br /> suggests that a new date for October 7th, 2016 be set to allow time for the second adequacy <br /> review and submittal items relating to the 5-Mile Pit Application. If this date is not suitable to <br /> the Division of Reclamation Mining and Safety (DRMS), Elam agrees to a date accommodating <br /> to the DRMS that is most appropriate. <br /> Thank you for your consideration of this request. Please do not hesitate to contact me if you <br /> have any questions regarding this matter. <br /> Sincerely, <br /> Jo than Mueller <br /> Environmental Compliance Coordinator <br /> Elam Construction, Inc. <br /> Phone: 970-242-5370 <br /> Email: ion.mueller(@-elamconstruction.com <br /> Xc: Amy Yeldell <br />
The URL can be used to link to this page
Your browser does not support the video tag.