Laserfiche WebLink
UtCOLORADO DIVISION OF RECLAMATI <br /> 1313 Sherman Street,Room 215,Denver,Colorado sop3vph(MINING 35 AND SAFETY <br /> V� <br /> REQUEST FOR TECHNICAL REVISION TR COVER SHEET RECE1VOn <br /> File No.:M- 2007-026 Site Name: Neilson Pit SEP 07 2016 <br /> County Moffat <br /> TR# LAIW�oN <br /> Permittee: Colowyo Coal Company L.P. AM <br /> Operator(If Other than Permittee): TR02) <br /> Permittee Representative: <br /> Tony Tennyson VIC0rnpIied! <br /> 0 Violations <br /> Please provide a brief description of the proposed revision: <br /> TR-02 proposes a new post-mine topography for the Neilson Pit and a revised seed mixture. <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. Amer the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Pcrrnit T e Required TR Fee Submitted (mark only one) <br /> I IOc, 111, 112 construction <br /> materials, and 112 quarries $216 ✓❑ <br /> 112 hard rock(not DMO) $175 <br /> 110d, 112d(1, 2 or 3) $1006 <br />