My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-31_REVISION - M1991037
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1991037
>
2016-08-31_REVISION - M1991037
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:21:05 PM
Creation date
9/1/2016 9:48:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991037
IBM Index Class Name
REVISION
Doc Date
8/31/2016
Doc Name
Request for Technical Revision
From
High Speed Mining
To
DRMS
Type & Sequence
TR4
Email Name
MAC
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To DDRMS Den Page 2 of 10 2016-08-31 16:05:58(GMT) 13032008630 From Greg Lewicki <br /> fin&7'ss <br /> tic^�, ��'� <br /> ;4! COLORADO DIVISION OF RECLAMA11ON, MINING AND SAFETA" <br /> 1313 Sherman Street,Room 215, Denver.Colorado 80203 ph(303)866-3567 <br /> REQUEST FOR TECHNICAL REVISION(TR)COVER SHEET <br /> File No.: M- 1991 -037 site Name Katuska Pit <br /> County 'ark TR MRNIS Use osily) <br /> (,/'*'Permittee: High Speed Mining, LLC oeGe11ileD <br /> Operator(If Other than Pertnittee): <br /> Perrrrittee Representative: Greg LewiCki and Associates <br /> DIVISION ION <br /> Please provide a brief description of the proposed revision: <br /> MINING AND SAFETY <br /> Addition of flocculant usage to the mining plan. <br /> As defined by the Minerals Rules; a Technical Revision (TR) is; "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plait." The Division is charged with determining if the revision as submitted <br /> meets this definition. if the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the '1R is submitted with the appropriate lec. the Division will <br /> determine if it is approvable within 30 days, if the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. Hat the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the Th unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is tip to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit It with <br /> your request, for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> I IOc, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 <br /> 1 IOd, l 12d(1, 2 or 3) $1006 <br /> �1 Annual Fee and Report -CW <br /> �1 No Violations <br />
The URL can be used to link to this page
Your browser does not support the video tag.