Laserfiche WebLink
RCFEIVE® <br />FEB 2015 <br />DIV15V,,. 'CLAMATIOti, <br />c: ;= • t Y <br />I IOc Annual Report <br />Page 2 of 3 <br />permittee Name: <br />Leone Sand & Gravel LLC <br />Permit Number: <br />M-1994-006 <br />Operation Name: <br />Emerald Vista Estate <br />County: <br />Las Animas <br />Annual Pee Due: <br />$323.00 <br />Anniver5a g Date: <br />March 11, 2015 <br />Permit Acreage: <br />9.40 <br />Current Bond Amt: <br />$15,000.00 <br />According to C.R.S. 34-32.5-116 or 34-32-116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual, Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior In the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is ad%isable that the issues be rectified promptly to avoid possible enforcement action_ <br />I. Is the site identification sign posted in accordance with Rule 3.1.12(1), <br />YES NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1,12(2). <br />s NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile remo%al is complete)? <br />YES 6D <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />5. Does the mine operate more than 180 days per year'! <br />YES NO <br />If "NO", please rev ie%v Rule 1.13 to assure that your mine is in compliance_ <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status'' <br />YES NO <br />b) approval far INTERMITTENT OPERA"PION? <br />YES NO <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />S. Number ofacres that were newly affected during the current report year_ <br />9. Number of acres that were reclaimed during tine current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />1 l . Estimated acres to be reclaimed in the next report year. <br />12. 'rntui acres in various stages of reclamation, since permitted mining activities began: <br />Total acres <br />Total acresTotal <br />acres <br />'replaced: <br />Total acres <br />backfilled: <br />seeded w/ <br />w/topsoil <br />mulched w/approved <br />mix: <br />approved mulch. <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application <br />graded: <br />fertilized w/ <br />replacement <br />rate (tons+ac): <br />a vd fertilizer: <br />depth (in.): <br />Seed <br />Fertilizer <br />Mulch <br />application <br />application <br />application <br />method: <br />method: <br />method-. <br />