Laserfiche WebLink
4"'A%Wildcat <br />on <br />Ah0%*(*rwt►ui�RODR <br />July 5, 2016 <br />Mr. Dustin Czapla <br />Mr. Russ Means <br />Colorado Division of Reclamation Mining and Safety <br />101 South 3d, Suite 301 <br />Grand Junction, Colorado 81501 <br />Re: Technical Revision (TR -5.1) Request <br />Reclamation of Little Deadwood Gulch and Chief Portal <br />May Day Idaho Mine Complex <br />Permit No. M-1981-185 <br />112d-1 Reclamation Permit <br />Board Order Signed -March 3, 2016 <br />Gentlemen: <br />RECEIVED <br />JUL 0 8 2016 <br />GRAND JUNCTION FIELD OFFICE <br />N OF <br />RECLAMATION MIN NG & SAFETY <br />The following is Wildcat Mining Corporation (Wildcat) technical Revision (TR -5.1)1 requesting <br />approval of the following field construction modification to the approved remedial plan. The <br />original portal stability and portal access plan was designed by Carroll & Lange-Manhard <br />(Manhard) and submitted to the Division on March 18, 2013. The geotechnical component was <br />designed by R Squared, Inc. (Mr. Erich Rauber -PE Colorado Registration 26647). Technical <br />Revision (05) was approved April 1, 2013. <br />Wildcat pursuant the Colorado Mined Land Reclamation Board (Board) Order dated March 3, <br />2016 committed to initiating site remedial activities on or before May 15, 2016 and to complete <br />site remedial activities on or before July 1, 2016. On June 22, 2016 the Board approved an <br />extension of the completion date for culvert installation on or before October 15, 2016. The <br />extension was extended to permit Wildcat Mining Corporation the time to obtain permit approval <br />from the Army Corp of Engineers and the U.S. Environmental Protection agency. <br />On June 28, 2016, Wildcat Mining Corporation submitted a Chief Portal "As -Built" report <br />summarizing historical permitting and portal and Incas road stability. All approved remedial <br />activities were completed on June 28, 2016. TR -05.1 is submitted pursuant Minerals Rules and <br />' Reclamation of Little Deadwood Gulch and Chief Portal <br />Wildcat Mining Corporation <br />3926 North State Hwy 67 <br />Sedalia, Colorado 80135 <br />303.832.7664 <br />July 5, 2016 <br />