Laserfiche WebLink
1. Permittee/Person <br />NEW ELK COAL COMPANY LLC <br />2. Address <br />12250 HIGHWAN' 12 <br />� .f <br />VI <br />U.S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING fR��acn 1 <br />Mine Site Evaluation pt��s+oR°9&Saye ' <br />State Program M"' ccr <br />3. City 4. State <br />1YESTON CO <br />5. Zip Code 6. Phone Number <br />81091 (303)300.8718 <br />9. Permit Number 10. Permit Type <br />C-St-o13I PP <br />11. Field Visit Date <br />12. Purpose <br />13. SRA Present <br />6t9/2016 <br />10C 71 <br />Signature <br />Review Date: <br />mm.d:r.yyyy ` <br />Is Supplemental MSE Page Used Y/N 0 <br />- r, " <br />Christine Dclka, ID4182 <br />Printed Name <br />Date: 6/23/2016 <br />14. Permit Status <br />15. Site Status <br />16.Facili! Type <br />`L` J <br />I <br />( R <br />� J <br />17. OSM Office ft <br />18. CCID a <br />19, Land Code <br />140 <br />7. Operator Name, if PANYent than Permittee 20.1 M.S.I0 I� 21. State bbrcv. 22. Count_ _ ylRurrottgh <br />N1:11' ELK COAL COMPANY LLC 105.02820 CU l.A-S�ANI,�-1A5� <br />8. Mine Nanic 23. AVS Permittee Entity ID Number 24, State Office <br />GOLDEN EAGLE 1158034 <br />25. flours <br />26. Signature Block <br />27. Reviewing O cial. <br />4.0 a. Permit Review <br />2.0 b. Site Visit Time <br />6,0 e. Travel Tinic <br />2.0 d. Report Writing <br />Signature <br />Review Date: <br />mm.d:r.yyyy ` <br />Is Supplemental MSE Page Used Y/N 0 <br />Signature <br />Christine Dclka, ID4182 <br />Printed Name <br />Date: 6/23/2016 <br />Permit Type -Item 10 IP a Interim Program PP - Permanent Program NP a No Permit <br />Purpose Typo Co os -Its An 1 CCR Citizen Complaint Referral (non•sita visit <br />Oxx Overs'ght RFx-Reclamation Fees CC... ClUtan Complaint (initial site visit) <br />Axx .Assistance Fxx...Federal Actions CCF .Assistance <br />Joint nspect on • Item 13 A joint inspection is wfien a state mseactor accompanies en mepector et any time during the review of ilie m ne site <br />Perrot Status - Item 14 AB Abandoned All surface and underground coal mining activities have ceased and operator <br />A Active Coal mining activities occurring or permitted but not yet has left the site without completing reclamation As defined In 30 CFR 840 11(o) <br />disturbed A81 Bond Forfalture Bond forfeiture officially In process or completed and reclamation In <br />IN Inactive (Permanent Program Permiq: Phase 11 completed or progress or not yet commenced <br />Temporary Cessation of Operations. (Interim Program Permit): A82 Partially Reclaimed Forfeiture Forfeited site where all bonds have been used to reclaim Ste <br />Coal mining compleled and reclamation activities Initiated. but site not recialmad to Program standards <br />RR Bond Release Reclamation completed and State Regulatory AB3 Reclaimed Forfeiture Forfeited site that has been reclaimed to Program standards <br />Authority(RA) has released all of the bond (Phase III Release). NA Not Applicable "'hen site is unpormitted. <br />Sita Status - Item 16 MC Mining Complete: No mining activity on site site NS Non-Ske Visit: Status of elle not determined <br />NO No DioNtbanca No coal m ntng and reclamation regraded and awaiting bond release Forfeiture Pending The RA Is pursuing actions to <br />operations have boon started. TC Temporary Cessation Tho RA has granted FP revoke the permit, collect the performance bond($) <br />EX Coal Exploration Coal exploration operations have cessation of mining pursuant to 30 CFR andtor reclamation of fode'led site Is In progress <br />started and where coal mining operations have not 8161817:13(b). FR Fodaded and Radalmed Forfeiture recJomntion <br />begun P1 Phase I Release. At least Phase I bond release completed <br />AP Active Coal Producing Coat surface mining granted for entre permitted area For Intarim FO Abandoned Site Abandoned site that Is permitted but <br />activities aro occurring permits, partial bond release there is no bond <br />AN Active Non -Producing Active non -producing facility P2 Phase II Release: At least Phase II bond release WC 1Mldcat: Coal mining and reclamation oparatons have <br />such as tipple or preparation planL for the Anita permitted area, or are taking place and the activity Is not covered by <br />Nh1 No Mining Tha PermitStatus Is active, site Is not In P3 Phase lit Release- Reclamation completed and the required permits from the RA. <br />Temporary Cessation no surface coat mining the RA hos released all bond <br />activity, and site not regraded <br />Facility Type Codes - Item 16 0 .... Ancillary (Naufroad, Conveyor, and/or Ralls N Exploration Permits K. Government Financed Construction Exemption <br />A Surface E....Refuse and/or Impoundment 1 Notice of Intent to Explore L Remining site permitted under 30 CFR 785.25 <br />B Underground F.. -Loading Facility and/or Tipple J ,Exempt 16 and 2/3 <br />C Preparation Plant 0,...Stockpiles <br />Small Business Regulatory Enforcement Fsimess Act (SBREFA) <br />Your Comments are ImporUnt <br />The Sma'I But'ness and Agrlplturs Reysretory Grdorcament Ombudsman end 10 Replonal Femess Boards were esIbUishad to receive cvrrvswnts arm amal biwnesies about Fadorat agwq <br />anforr:m:ant aWms 7m Ombudsman con annuity ava.Lale Asa enforcement acthitm and rate each agencys responslveneSs to Small business 11 you area Smarr bus'aess (a buiswss mitis 500 or <br />taper employees including those of aa1 iaees) endwlsh to corrAwt on Ura aMorr:ement u compnaoce 80MLes or OSM Fal t-M-REGFAIR ("ea.7343247) <br />Page 1 <br />