Peab I <br />1111 ENERGY <br />Twentymile Coal, LLC <br />RE,'FINfED <br />,IUs 2 3 2016 <br />Division of Redam0On' <br />Mining & Safetjl <br />29515 Routt County Road 27 <br />Oak Creek, CO 80467 <br />970 879.3800 <br />Mr. Jared Ebert, Environmental Protection Specialist June 21, 2016 <br />Division of Reclamation, Mining, and Safety <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />(303) 866-3567 X 8120 <br />RE: Twentymile Coal, LLC - Foidel Creek Mine (Permit No. C-82-056), Minor Revision (MR16-300) — <br />Washplant Modification <br />Dear Mr. Ebert: <br />Twentymile Coal, LLC (TC) requests CDRMS approval of a Minor Revision to our existing approved Permit for <br />modification of the existing Washplant. In conjunction with development, mining, and related operations for the <br />Wolf Reserve, TC plans to add an additional crusher within the existing Washplant building. Installation of this <br />additional equipment will require extension of the building foundation on the southeast corner of the Washplant; <br />construction of a building extension for maintenance access to the new crusher; construction of two additional <br />support piers, a 20 -foot extension of the existing electrical room, and a new metal walkway and stairs; and <br />construction of an additional concrete support pad and containment structure for an additional electrical <br />transformer. The Washplant building extension will have a footprint of 11.3 feet x 19.2 feet and will extend to 34 <br />feet above grade, with a sloping roofline connecting it to the existing building. The electrical equipment room will <br />be approximately 8 feet x 20 feet and will be supported by two existing concrete piers and two new piers. The new <br />walkway will be approximately 4 feet wide and 28 feet long and will be supported by beams extending from the <br />electrical equipment room. The additional transformer pad will be 10.5 feet x 11.75 feet. The building extensions <br />will be steel frame with coated corrugated metal siding. <br />The planned foundation and building extensions will be within the existing Washplant disturbance area, so there <br />will be no new or additional surface disturbance, no additional environmental studies are required, no additional <br />soil material stripping will occur, and all areas are addressed by the existing drainage and sediment control <br />structures. The Washplant installation will remain in place as long as needed to support ongoing and future mining <br />and related activities. Reclamation of this installation will involve removal of the installed equipment, salvage or <br />demolition of the building enclosures and pads, demolition of concrete piers to at least 3 feet below final grade, <br />removal from the site or placement of concrete demolition debris as fill in the mine portal area, regrading and <br />drainage reestablishment, soil material replacement, and revegetation. <br />This submittal includes revised PAP text and exhibits addressing the location, configuration, operation, <br />maintenance, and reclamation of the proposed Washplant modifications. New and revised PAP materials are <br />identified by the attached Summary of Revisions/Additions. We would like to proceed with this project as soon as <br />possible, to support our ongoing mining activities. We, therefore, appreciate your consideration, cooperation, and <br />assistance in facilitating timely review and approval of this revision application. After you have opportunity to <br />review the accompanying information, please feel free to contact me with any questions or to discuss submittal <br />materials or related matters. <br />Best regards, <br />Twen e Coal CSA <br />erry ettl <br />Manager E 1 amental Affairs <br />