My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-04-15_REPORT - C1981014
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981014
>
2016-04-15_REPORT - C1981014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 10:08:52 AM
Creation date
4/15/2016 10:31:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Report
Doc Date
4/15/2016
Doc Name
Annual Reclamation Report (Revised)
From
Energy Fuels Coal, Inc
To
DRMS
Annual Report Year
2015
Permit Index Doc Type
Annual Reclamation Report
Email Name
RDZ
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
energy fuels coal, inc RECEIVED <br />p o box 459 • 115 east main street • florence, colorado 81226 <br />April 8, 2016 <br />Mr. Rob Zuber, P.E., Environmental Reclamation Specialist <br />Division of Reclamation, Mining, and Safety <br />1313 Sherman ST, Room. 215 <br />Denver, CO 80203 <br />Re: 2015 Annual Reclamation Report — Revised Form Submittal <br />Southfield Mine (Permit No. C-1981-014) <br />Dear Mr. Zuber: <br />APR 15 2016 <br />DIVISION OF RECLAMATION <br />MINING & SAFETY <br />Energy Fuels Coal Inc. (EFCI) is hereby submitting a revised Annual Reclamation Report (ARR) form for <br />the 2015 report. Two changes were made to the previously submitted form as follows: <br />• The Phase I released acreage was changed from 81.8 acres to 83.1 acres. We discussed this <br />number with the Division and agreed that 83.8 acres is the correct combined total of acres released <br />in the approved SL -01 and SL -02 bond release applications. <br />• The acres in long-term mining or reclamation facilities was changed from 18.7 acres to 19.7 acres. <br />This value is 0.8 acres less than the 20.5 acres shown on the 2014 ARR. The reason for this <br />difference is due to slight inaccuracies in the acreages reported in previous years for this category. <br />The mine site and loadout are now completely reclaimed with the exception of a very small area at <br />the mine site. Therefore, for the 2015 report, EFCI has calculated 19.7 acres as the correct value <br />based on the total reported disturbed acres (106.3) minus the acres reported as graded and seeded <br />(86.3), and minus acres yet to be reclaimed (0.3). <br />Please find attached copy of the revised 2015 ARR form for the Southfield Mine. <br />Please contact me if you have any questions or require further information. <br />Sincerely, <br />Allen S. Weaver <br />Energy Fuels Coal, Inc. <br />Enclosure <br />
The URL can be used to link to this page
Your browser does not support the video tag.