Laserfiche WebLink
4/7/2016 State.co.us Executive Branch Mail - Fwd: Twentymile Coal, LLC - Foidel CReek Mine (C-82-056), MR16-295 Passive Treatment System Geotech <br />STATE, OF Hernandez - DNR Alysha <alysha.hernandez@state.co.us> <br />COLORADO ' <br />Fwd: Twentymile Coal, LLC - Foidel CReek Mine (C-82-056), MR16-295 Passive <br />Treatment System Geotech <br />1 message <br />Ebert - DNR, Jared <jared.ebert@state.co.us> Wed, Apr 6, 2016 at 2:09 PM <br />To: Alysha Hernandez - DNR <alysha.hernandez@state.co.us> <br />Division's response to adequacy review response. MR295, Foidel Creek Mine <br />---------- Forwarded message ---------- <br />From: Ebert - DNR, Jared <jared.ebert@state. co.us> <br />Date: Wed, Apr 6, 2016 at 2:08 PM <br />Subject: Re: Twentymile Coal, LLC - Foidel CReek Mine (C-82-056), MR16-295 Passive Treatment System <br />Geotech <br />To: "Nettleton, Jerry" <JNettleton@peabodyenergy,com> <br />J erry, <br />Attached is an updated reclamation cost estimate for the revision. I agree that we can probably take out the Job <br />Super. cost given the size and type of work. The cost of "reclamation management and/or administration" is a <br />cost associated with the required Division inspection and oversight during the project as well as the required <br />inspection following project completion (until the Division's termination of jurisdiction, which is a minimum of 10 <br />years after project completion). Given this, I cannot remove the cost, however as these areas would roll into the <br />larger site wide reclamation project in the unlikely event of permit revocation and forfeiture, the percentage used <br />to estimate this cost can be lowered given the size of the entire mine. <br />am ready to approved the revision if you concur with the estimate. <br />Jared <br />On Tue, Apr 5, 2016 at 12:43 PM, Nettleton, Jerry <JNettleton cr peabodyenergy,com> wrote: <br />Jared - <br />The attached revised pages respond to the items identified in your 04/01/16 Adequacy letter. <br />also reviewed the bond calculation - Given that the track -hoe that will be excavating the test pits, will <br />backfill, regrade, and re -spread the soil materials for each pit before moving on to the next one, as a practical <br />matter, I'm not sure that we need to include time and costs for a "Job Superintendent" or for "Reclamation <br />Management and/or Administration" in the reclamation estimate?? <br />Please feel free to contact me with questions, or to discuss - <br />Best regards, <br />Jerry <br />Jerry M. Nettleton <br />Manager Environmental Affairs <br />Twentymile Coal, LLC <br />29515 RCR27 <br />https://mail.googl e.com/m ai I/u/0/?ui=2&i k=e29129fcb5&view=pt&search= i nbox&th=153ed3l9dObeOO6a&si m l=153ed3l9dObeOO6a 1/3 <br />