My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-04-05_REVISION - C1982056
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2016-04-05_REVISION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:20:34 PM
Creation date
4/7/2016 6:46:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
4/5/2016
Doc Name
Adequacy Review Response (emailed)
From
Twentymile Coal, LLC
To
DRMS
Type & Sequence
MR295
Email Name
JLE
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4/7/2016 State.co.us Executive Branch Mail - Fwd: Twentymile Coal, LLC - Foidel CReek Mine (C-82-056), MR16-295 Passive Treatment System Geotech <br />STATE, OF Hernandez - DNR Alysha <alysha.hernandez@state.co.us> <br />�C O L,O R�'AI O ' <br />Fwd: Twentymile Coal, LLC - Foidel CReek Mine (C-82-056), MR16-295 Passive <br />Treatment System Geotech <br />1 message <br />Ebert - DNR, Jared <jared.ebert@state.co.us> Wed, Apr 6, 2016 at 1:55 PM <br />To: Alysha Hernandez - DNR <alysha.hernandez@state.co.us> <br />Please scan this adequacy response e-mail into the file for MR295 for the Foidel Creek Mine. <br />Thanks, <br />Jared <br />---------- Forwarded message ---------- <br />From: Nettleton, Jerry <JNettleton@peabodyenergy,com> <br />Date: Tue, Apr 5, 2016 at 12:43 PM <br />Subject: Twentymile Coal, LLC - Foidel CReek Mine (C-82-056), MR16-295 Passive Treatment System Geotech <br />To: "jared.ebert@stateocoous" <jared.ebert@state. co.us> <br />Jared - <br />The attached revised pages respond to the items identified in your 04/01/16 Adequacy letter. <br />also reviewed the bond calculation - Given that the track -hoe that will be excavating the test pits, will backfill, <br />regrade, and re -spread the soil materials for each pit before moving on to the next one, as a practical matter, I'm <br />not sure that we need to include time and costs for a "Job Superintendent" or for "Reclamation Management <br />and/or Administration" in the reclamation estimate?? <br />Please feel free to contact me with questions, or to discuss - <br />Best regards, <br />Jerry <br />Jerry M. Nettleton <br />Manager Environmental Affairs <br />Twentymile Coal, LLC <br />29515 RCR27 <br />Oak Creek, Colorado 80467 <br />970.870.2712 <br />jnettleton@peabodyenergyocom <br />-----Original Message ----- <br />From: SGCCopier@peabodyenergyocom [mailto:SGCCopier@peabodyenergyocom] <br />Sent: Tuesday, April 05, 2016 12:45 PM <br />To: Nettleton, Jerry <br />Subject: Scanned from a Xerox multifunction device <br />https://mail.googl e.com/m ai I/u/0/?ui=2&i k=e29129fcb5&view=pt&search= i nbox&th=153ed24d4b26a8a6&si m l=153ed24d4b26a8a6 1/2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.