Laserfiche WebLink
4/5/2016 State.co.us Executive Branch Mail - NH2 MR -99 memo <br />. 0STATE OF Hernandez - DNR, Alysha <alysha.hernandez@state.co.us> <br />COLORADO <br />NH2 MR -99 memo <br />1 message <br />Bowles - DNR, Brock < brock. bowles @state. co.us> Fri, Apr 1, 2016 at 4:21 PM <br />To: Tony Tennyson <ttennyson@tristategt.org>, Chris Gilbreath <cgilbreath@tdstategt.org>, Alysha Hernandez <br /><alysha.hernandez@state.co.us> <br />Tony and Chris, <br />Rule 4.05.18(1) states that the Division can authorize mining operations within a stream buffer zone (SBZ) upon <br />finding that the requirements of 4.05.18(1)(a -c) are met. I wrote a memo explaining why the Division authorized <br />mining operations within the SBZ at NH2 and how WFC has committed to minimizing its impact. <br />A copy of that memo is attached for your records. <br />Brock <br />Brock Bowles <br />Environmental Protection Specialist <br />COLORADO <br />• Department of Natural Resources <br />P 303.866.3567 x8142 I F 303.832.8106 <br />1313 Sherman St., Suite 215, Denver, CO 80203 <br />brock.bowles@state.co.us I http://mining.state.co.us <br />fj MR -99 Findings Memo.pdf <br />134K <br />https://mail.google.com/mail/u/0/?ui=2&ik=e29129fcb5&view=pt&search=inbox&th=153d3ea99672bbac&siml=153d3ea99672bbac 1/1 <br />