My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-04-04_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2016-04-04_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:20:33 PM
Creation date
4/5/2016 9:19:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
4/4/2016
Doc Name
4th Preliminary Adequacy Response
From
Tri-State Generation and Transmission Association, Inc
To
DRMS
Type & Sequence
PR4
Email Name
ZTT
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRI-STATE GENERATION AND TRANSMISSION ASSOCIATION, INC. <br />HEADQUARTERS: P.O. BOX 33695 DENVER, COLORADO 80233-0695 303-452-6111 <br />March 31, 2016 <br />Mr. Zach Trujillo <br />Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining & Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RE: Colowyo Coal Company L.P. <br />Permit No. C-1981-019, <br />Permit Revision No. 04 (PR -04) <br />Fourth Preliminary Adequacy Response <br />Dear Mr. Trujillo, <br />G��IIc1,ON OF Rp � SON <br />M�N�NG AN <br />Tri-State Generation and Transmission Association Inc. (Tri-State), is the parent company to <br />Axial Basin Coal Company, which is the general partner to Colowyo Coal Company L.P. <br />(Colowyo). Tri-State received the Division's adequacy letter dated March 14, 2016, and Tri- <br />State on behalf of Colowyo has the following responses: <br />ITEM 1. See Item 81 below. <br />Response: No response required. <br />ITEM Z Response is adequate. <br />ITEM 3. Response is adequate. <br />ITEM 4. Response is adequate. <br />ITEM S. Response is adequate. <br />ITEM 6. Response is adequate. <br />ITEM 7. Response is adequate. <br />ITEM 8. Response is adequate. <br />ITEM 9. Response is adequate. <br />ITEM 10. Response is adequate. <br />ITEM 11. Response is adequate. <br />ITEM 12. Response is adequate. <br />AN EQUAL OPPORTUNITY 1 AFFIRMATIVE ACTION EMPLOYER CRAIG STATION ESCALANTE STATION NUCLA STATION <br />P.O. BOX 1307 P.O. BOX 577 P.O. BOX 698 <br />- CRAIG, CO 81626-1307 PREWITi NM 87045 NUCLA, CO 81424-0698 <br />R Touchstone Energy°Cooperative <br />s .. 970-824-4419 505-972-5200 970.864-7316 <br />
The URL can be used to link to this page
Your browser does not support the video tag.