My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-29_REVISION - C1981008 (6)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2016-02-29_REVISION - C1981008 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:19:45 PM
Creation date
2/29/2016 10:29:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
2/29/2016
Doc Name
Proposed Decision Letter (Revised)
From
DRMS
To
Alan Boehms Office of Surface Mining Western Regional Coordinating Center
Type & Sequence
SL16
Email Name
BFB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO <br />Division of Reclarnatio , <br />,. <br />Mining and safety <br />Department of Natural Resources <br />1313 Sherman Street, Roorn 215 <br />Denver, CO 80203 <br />February 29, 2016 <br />Alan Boehms <br />Office of Surface Mining <br />Western Regional Coordinating Center <br />1999 Broadway, Suite 3320 <br />Denver, CO 80202 <br />Re: New Horizon Mine (Permit No. C-1981-008) <br />Bond Release Application No. 16 (SL -16) <br />Dear Mr. Boehms: <br />The Colorado Division of Reclamation, Mining and Safety has re -issued a proposed decision to <br />approve Bond Release Application No. 16 at the New Horizon Mine. This decision will become <br />final at the close of the thirty (30) day public comment period, which commences with the initial <br />publication in the San Miguel Basin Forum. A copy of the proposed decision and written <br />findings is enclosed. <br />The Division proposed to approve SL -16 on January 5, 2016 with the initial reclamation cost <br />estimate of $5,432,359.95. As a result of the work accomplished for SL -16, the reclamation cost <br />estimate was reduced by $436,761.74 for a remaining liability of $4,995,598.21. During this time, <br />TR -69 was finalized which increased the mine's liability by $9,585.90. This amount, however, was <br />not included in the SL -16 cost estimate. The Division's decision to approve SL -16 is being re - <br />proposed to include the increased liability costs associated with TR -69. <br />As provided by Rule 3.03.2(6), should you object to the Division's proposed decision, you may <br />request an adjudicatory hearing. <br />If you have questions or need of additional information, please contact me. <br />1313 Sherman S'tree't, Roorn 215, Denver, CO 80203 P 303,8EiE 3567 F 303,832,8106 Ih't'tl:a:l/rnining.sta'te.co.0 s <br />John W. Hickenlool:aer, Governor I Mike King, Executive Director I Virginia Brannon, Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.