Laserfiche WebLink
Page 3 of 5 <br />112c Annual Report <br />RECEIVEDOperation <br />JAN 2 8 2016 <br />DIVISION OF RECLAMATION <br />41,1-4 <br />(411p`��"r% <br />Permit Number <br />M-2000-080 <br />Permittee Name: <br />Pioneer Sand Company, Inc. <br />Name: <br />Pioneer Farm <br />County: <br />Arapahoe <br />Anniversary Date: <br />January 23, 2016 <br />Current Bond Amt: <br />$47,215.00 <br />Annual Fee Due: <br />$791.00 <br />(DRMS Office Use Only) <br />Permit Acreage: <br />DRMS Special <br />TOD <br />According to C.R.S. 34-32.5-116 or 34-32-116, each year, on the iversaty date of the permit, an operator shall submit <br />the Annual Fee, an. Annual Report and Map showing the extent of cu t disturbances to affected land, required monitoring <br />information, reclamation accomplished to date and during the preceding year, any new disturbance that is anticipated to <br />occur during the upcoming year, any reclamation. that will be performed during the upcoming year, the dates for the <br />beginning of active operations, and the date active operations ceased for the year. <br />Information "naked in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. lf, while completing this report, you. Team that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1_ Is the site identification sign: posted in accordance with Rule 3.1.12(1)? �'ES NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2)? « NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES • 'O <br />If YES: please note time limits related to completion of reclamation, Rule 3.1.3. <br />4_ What was the date of last excavation, processing or hauling activity at the mine? <br />5. Does the mine operate more than 180 days per year? <br />If "NO:", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Ilas this mine been granted: a) approval of TEMPORARY CESSATION Status? YES I <br />h) approval for INTERMITTENT OPERATION? � NO <br />Number of acres currently affected (mining+ incomplete and or unreleased reclamation): 10 <br />8- Number of acres that were newly affected during the current report year 4 <br />9. Number of acres that were reclaimed during the current report year r% <br />5. <br />YLNO <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year <br />G <br />