Laserfiche WebLink
12/22/2015 State.co.us Executive Branch Mail -Re: Twentymile Coal, LLC- Foidel Creek Mine -MR 15-291 13 -Left OUtby Utility Borehole Completeness Response <br />STATE, OF Hernandez - DNR Alysha <alysha.hernandez@state.co.us> <br />COLORADO ' <br />Re: Twentymile Coal, LLC - Foidel Creek Mine - MR15-291 13 -Left OUtby Utility <br />Borehole Completeness Response <br />1 message <br />Ebert - DNR, Jared <jared.ebert@state.co.us> Mon, Dec 21, 2015 at 4:17 PM <br />To: "Nettleton, Jerry" <JNettleton @peabodyenergy. com> <br />Cc: Alysha Hernandez - DNR <alysha.hernandez@state.co.us> <br />Jerry, <br />have not received the hard copy of your completeness review response with the necessary map, thus I have <br />not deemed the application complete. However, in order to expedite the process I have reviewed all of the <br />application material that I have received. Below are items that will need to be addressed prior to approval of the <br />MR291 application. <br />1. TC revised permit pages 2.04-9.1 and 9.2 with MR292. MR292 added a new section specifically for the <br />13LT Outby Utility Borehole cultural resource survey. The originally proposed revised pages submitted with <br />MR291 did not take MR292 into account. Page 2.04-9.1 no longer needs to be revised, but page 2.04-9.2 needs <br />to be revised to add a discussion about the results of the cultural resource survey that was conducted under the <br />new section created for this project with MR292. <br />2. Proposed revised pages 2.05-45.29 and 2.05-84.13, indicates a maximum of 1.0 feet of soil material from <br />the road and pad disturbed area will be recovered and stockpiled. Based on Map 17 of the permit, the new <br />proposed road falls within a portion of soils unit 50E and D10 and the pad area falls within soil unit D10. The <br />average soil thickness for soils unit D10 and 50E is 30 inches and 18 inches respectively. Given this, the soils <br />recovery plan does not appear to be adequate. Please revise the soils recovery and storage plan to salvage all <br />available topsoil. Please revise the above referenced pages accordingly. Also, please update Table 49A with <br />the revised estimate of topsoil to be salvaged. <br />3. The first paragraph of proposed revised page 2.05-106.1 does not follow with the paragraph from the <br />previous page. Please revise these pages for consistency. <br />Once I get the hard copy of your response, I will deem the application complete. Please let me know if you <br />have any questions. <br />Thanks, <br />Jared <br />On Fri, Dec 18, 2015 at 11:24 AM, Nettleton, Jerry <JNettleton@peabodyenergy.com> wrote: <br />Jared - <br />Attached is the response package (less maps) for the above -referenced MR. The hard -copy with maps will be <br />mailed -out today for your files. <br />Given the delays associated with obtaining the required cultural resource survey, we are very tight on our <br />schedule to get this work completed in order to meet our operational requirements. Therefore, any help you <br />can provide in expediting final review and approval will be greatly appreciated. If there are any additional <br />items that you identify in your final review, please let me know right away so we can respond immediately. <br />We appreciate your consideration and cooperation. If I don't talk with you between now and Christmas - Have <br />a wonderful and blessed holiday with family and friends - <br />https://mail.googl e.com/m ai I/u/0/?ui=2&i k=e29129fcb5&view=pt&search= i nbox&th=151 e6d5d32b6ec0d&si m l=151 c6d5d32b6ecOd 1/2 <br />