Laserfiche WebLink
U.S. DEPT. OF THE INTERIORECEIVEa <br />OFFICE OF SURFACE MINING NOV 2 4 2015 <br />Mine Site Evaluation <br />Division of Reclamation �C�*/ <br />State Program a/1;, _ _ <br />yJ Od <br />1. Permittee/Person 9. Permit Number 10. Permit Type <br />TRAPPER MINING INC C•81-010 PP <br />2, Address 11. Field Visit Date 12, Purpose 13. SRA Present <br />PO BOX 187 11/3/2015 OP 0 <br />n1•dd-stn <br />3. City 4. State <br />14. Permit Status <br />15, Site Status16. <br />Pacilit T' pe <br />CRAIG CO <br />L``� <br />AP <br />5. Zip Code 6. Phone Number <br />17. OSM Office # <br />18. CCID 4 <br />19. Land Code <br />81616 1(970) 8244401 1 <br />1140 <br />F <br />SF <br />7. Operator Name, if Different than Permittee <br />20. M,S.H.A. ID N <br />2l. State Abbrev. <br />22, Cotln /Burrough <br />TRAPPER MINING INC 1 <br />105-02838 <br />CO <br />AlOFF�T <br />8. Mine Name 23, AVS Permittee Entity ID Number 24. State Office <br />TRAPPER (WINE 90118 <br />25. Hours <br />26, Signature Block <br />27.eviewin Official: <br />4.0 a. Permit Review <br />6'41* ^' % <br />� <br />Signature <br />Signature: <br />3.0 b. Site Visit Time <br />8.0 c. Travel Time <br />G.0 d. Report Writing <br />Christine Belka, IDHI82 <br />Rcview Date: ' 2- <br />mm.dd. rrrr <br />Is Supplemental MSG Page Used Y/N Q <br />Printed Name <br />Dale: if1/18/2015 <br />Permit Type -Item 10 IP =Interim Program PP -Permanent Program NP = No Permit <br />Purpose Type Codes • Item 12 CCR Citizen Complaint Referral (non site visit <br />Oxx .Oversight RFx Reclamation Fees CC Citizen Complaint (In tial sae visit) <br />Axx .Assistance Fxx Federal Actions CCF .Assistance <br />Joint inspection • Item 13 A joint inspection is when a state inspector accompanies an inspector 8t any time during iFe review 61 the mine site <br />Permit Status - Item 14 AS Abandoned All surface and underground coal mining octMt es have ceased and operator <br />A Active: Coal mining activities occurring or permuted but not yet has left the site without completing reclamation as defined In 30 CFR 840 11(g) <br />disturbed ABI Bond Forfellure Bond forfealure officially In processor completed and reclamation in <br />IN Inactive (Permanent Program Permit) Phase II i ompleled or progress or not yet commenced <br />Temporary Cessation of Operations. (Interim Program Permit) A82 Partialty Recialmed Forfeiture Forfeited site where all bonds have been used to reclaim site. <br />Coal mining completed and reclamation activities initiated. but site not recialmed to Program standards <br />SR bond Release Reclamation completed and Stale Regulatory AB3 Reclaimed Forfeiture Forfeited site that has been reclaimed to Program standards <br />Authodly(RA) has released all of the bond (Phase III Release) NA Not Applicable When s to is unpermitted <br />Site Status - Item 15 MC Mining Comp'ete No mining activity on Bile, site NS Non -Site Vislt Status of site not delermtned <br />NO No Disturbance. No coal mining and reclamation regraded and await ng bond release Forfeiture Pending The RA is pursuing actions to <br />operations have been started TC Temporary Cessation The RA has granted FP revoke the permit, cot act the performance bond(s), <br />EX Coal Exploration. Coal exp'oration operations have cessation of mining pursuant to 30 CFR and/or reclamation of forfeited site Is In progress <br />started and where coal min'ng operations have not 6161817 13(b) FR Forfeited and Retia med Forfeiture reclamation <br />begun P1 Phase I Release. At least Phase I bond release completed <br />AP Active Coat Producing Coal surface mining granted for entire permitted area. For Interim FO Abandoned Site Abandoned site that Is permitted but <br />activities are occurring permits, partial bond release there Is no bond. <br />AN Active Non -Producing Active non -producing facility P2 Phase II Release. At least Phase II bond release WC Wildcat Coal mining and reclamation operations have <br />such as tipple or preparation plant. for the entire perm tted area or are taking place and the activity Is not covered by <br />NM No Mining The Permit Status Is active s (e Is not In p3 Phase III Release. Reclamation completed and the required permits from the RA. <br />Temporary Cessation, no surface coal miring the RA has released all bond <br />activity and site not regraded. <br />Facility Typo Codes - Item 16 0, _Anclt'ary (Haulroad, Conveyor. and/or Rails H. Exploration Permits K. Goverment Financed Construction Exemption <br />A Surface E.. Refuse and/or Impoundment (..Notice of Intent to Explore L. Remining site permitted under 30 CFR 785 25 <br />8 . Underground F.. Loading Facility andfor Tipple J ,Exempt 16 and 213 <br />C . Preparation Plant G. Stockpiles <br />Small Business Regulatory Enforcement Felmess Act (SBREFA) <br />Your Comments are Important <br />The Sma1 Busmoss and AgricuNse RaVatory Erdomement Ombudsmen and 10 Regional Farness Boards were estab shed io recelve comments from small bus'nesses about Federal agency <br />anro.cemenl adfons The Ombudsman wil annually eva'uato the enforcement odWrii and rate ears agone/s responsiveness to sma9 business if you ere o smoti businoss (e business wdh -%W or <br />feral omployaos includ ng Ihoso of atfifiales) and wish to comment on the onforeamont or crmptanco adwitos of OSM eax s-e8t -REG•FAIR (1.888.734.3247). <br />Pape 1 <br />