My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-10-20_REPORT - M2008027
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2008027
>
2015-10-20_REPORT - M2008027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 9:43:16 AM
Creation date
10/21/2015 10:05:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008027
IBM Index Class Name
REPORT
Doc Date
10/20/2015
From
Black Diamond Minerals, LLC
To
DRMS
Annual Report Year
2015
Permit Index Doc Type
Annual Fee/Report
Email Name
ACY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br />OCT 2 0 2015 <br />DIViSiu,r ,,,..; ,%LCLAMATION, <br />MMI�ENERALS <br />110c Annual Report <br />Page 3 of 5 <br />Permittee Name: <br />Black Diamond Minerals, LLC <br />Permit Number: <br />M-2008-027 <br />Operation Name: <br />Tepee Park Ranch Shale Borrow Pit <br />County: <br />Garfield <br />Annual Fee Due: <br />Permit Acreage: <br />$323.00 <br />1.50 <br />Anniversary Date: <br />Current Bond Amt: <br />August 5, 2015 <br />$21,000.00 <br />According to C.R.S. 34-32.5-116 or 34-32-116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and snap showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1)? <br />YES NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2)? YES NO <br />Li,) o- are CeciJz,&in� 14,1s wZ'rlr . <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? S'1.21/5 <br />5. Does the mine operate more than 180 days per year YES CO <br />If "NO", please review Rule L 13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? YES NO <br />b) approval for INTERMITTENT OPERATION? (ESD NO <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation): ©, 3 <br />8. Number of acres that were newly affected during the current report year: <br />9. Number of acres that were reclaimed during the current report year: C) <br />10. Estimated new acreage to be affected in the next report year: <br />11. Estimated acres to be reclaimed in the next report year: <br />
The URL can be used to link to this page
Your browser does not support the video tag.