Laserfiche WebLink
RECEIVED <br />AUG' C '112015 <br />DIVISION 07 R'(-IAMAYION, <br />ftqftse�'-W <br />11 0(l) Annual Report <br />Page 3 of 5 <br />Permittee Name: <br />Colorado Alabaster Supply <br />Permit Number: <br />M-1989-077 <br />Operation Name: <br />Colo Alabaster <br />County: <br />Larimer <br />Annual Fee Due: <br />$86.00 <br />Anniversary Date: <br />August 28, 2015 <br />Permit Acreage: <br />1.90 <br />Current Bond Amt: <br />$1,500.00 <br />According to C.R.S. 34-32.5-116 or 34-32-116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1)? <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2)? <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? _ <br />5. Does the mine operate more than 180 days per year <br />If "NO", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation): <br />8. Number of acres that were newly affected during the current report year: <br />9. Number of acres that were reclaimed during the current report year: <br />10. Estimated new acreage to be affected in the next report year: <br />11. Estimated acres to be reclaimed in the next report year: <br />r� <br />f YES; NO <br />YES; <br />NO <br />YES NO ) <br />-56P; ccr- t3C�a, a U J4 <br />YES <br />YES <br />CNO� <br />'B, <br />NO <br />