My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-07-07_REPORT - M2000066
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2000066
>
2015-07-07_REPORT - M2000066
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:09:00 PM
Creation date
7/8/2015 9:33:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000066
IBM Index Class Name
REPORT
Doc Date
7/7/2015
Doc Name
Annual Fee, Report and Map
From
Lincoln County
To
DRMS
Email Name
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
vk <br />RECEIVED <br />JUL 0 7 2015 <br />[)WIS►UN St' RECLAMpW", <br />M R P <br />110c Annual Report <br />Page 3 of 5 <br />Permittee Name: <br />Lincoln County <br />Permit Number: <br />M-2000-066 <br />Operation Name: <br />Raymond Enderson Pit <br />County: <br />Lincoln <br />Annual Fee Due: <br />$323.00 <br />Anniversary Date: <br />July 12, 2015 <br />Permit Acreage: <br />9.90 <br />Current Bond Amt: <br />$0.00 <br />According to C.R.S. 34-32.5-116 or 34-32-116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with'Rule 3.1.12(1)? YES NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2)? NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YESO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. �✓' <br />4. What was the date of last excavation, processing or hauling activity at the mine? ///A-. <br />5. Does the mine operate more than 180 days per year YES t <br />If "NO", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status?1� <br />b) approval for INTERMITTENT OPERATION? CV�E NO <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation): <br />8. Number of acres that were newly affected during the current report year: 'C J <br />9. Number of acres that were reclaimed during the current report year: i <br />10. Estimated new acreage to be affected in the next report year: <br />11. Estimated acres to be reclaimed in the next report year: <br />
The URL can be used to link to this page
Your browser does not support the video tag.