Laserfiche WebLink
COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203 ph(303) 866-3567 <br />t 41 <br />, ! q7-7. 06y <br />REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br />File No.: M- 77-004H R <br />Site Name: Pitch Reclamation Project <br />County Saguache TR# (DRMS Use only) <br />Permittee: Homestake Mining Company of California <br />' Operator (If Other than Permittee): <br />Permittee Representative: Bill Ferdinand - Director of Environment <br />' Please provide a brief description of the proposed revision: <br />Installation of two peizometers and conduct pilot scale testing to evaluate uranium mass load <br />' reduction to surface water during the 2015 field season and serve as the basis for full-scale <br />design and implementation. <br />' As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br />which does not have more than a minor effect upon the approved or proposed Reclamation or <br />Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br />' meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br />the Division may require the submittal of a permit amendment to make the required or desired changes <br />to the permit. <br />' The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br />Division (as listed below by permit type). Please submit the appropriate fee with your request to <br />expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br />determine if it is approvable within 30 days. If the Division requires additional information to approve a <br />TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br />' day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br />permittee requests additional time, in writing, to provide the required information. <br />' There is no pre -defined format for the submittal of a TR; however, it is up to the permittee to provide <br />sufficient information to the Division to approve the TR request, including updated mining and <br />reclamation plan maps that accurately depict the changes proposed in the requested TR. <br />' Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br />your request for a Technical Revision. <br />Permit Type Required TR Fee Submitted (mark only one) <br />110c, 111, 112 construction ❑ <br />' materials, and 112 quarries $216 c <br />112 hard rock (not DMO) $175 ❑ <br />'11 Od, 112d(1, 2 or 3) $1006 ❑✓ �uN 2 3 2015 <br />' <br />✓ AF & Report @I�f1 t�N 0�SCLWO�0%� y1N� <br />✓ VIOLATION: MV -2012-011 <br />