My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-05-06_REPORT - M2002119
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2002119
>
2015-05-06_REPORT - M2002119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:00:03 PM
Creation date
5/7/2015 3:17:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002119
IBM Index Class Name
Report
Doc Date
5/6/2015
Doc Name
Annual Report & Map
From
Elam Construction, Inc
To
DRMS
Annual Report Year
2015
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECIIVED <br />MAY 0 6 2015 <br />DIVI$ho. -, F-CLAMAnON, <br />MININ - <br />� EPORi MA 40 <br />112c Annual Report <br />Page 2 of 3 <br />Permittee Name: <br />Elam Construction, Inc. <br />Permit Number: <br />M- 2002 -119 <br />Operation Name: <br />FetcherNale Pit <br />County: <br />Routt <br />Annual Fee Due: <br />$791.00 <br />Anniversary Date: <br />April 4, 2015 <br />Permit Acreage: <br />23.50 <br />Current Bond Amt: <br />$171,100.00 <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). <br />• <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />5. Does the mine operate more than 180 days per year? 'ES) NO <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? YES CQl ) <br />b) approval for INTERMITTENT OPERATION? YES <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). /8, <br />8. Number of acres that were newly affected during the current report year. 02 <br />9. Number of acres that were reclaimed during the current report year. �-�- <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />Total acres <br />backfilled: <br />Total acres <br />seeded w/ <br />approved mix: <br />b <br />Total acres <br />w /topsoil <br />replaced: <br />Total acres <br />mulched w/ <br />approved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application <br />graded: <br />6 <br />fertilized w/ <br />-- <br />replacement <br />rate (tons /ac): <br />ye; <br />apvd fertilizer: <br />depth (in.): <br />G <br />Seed <br />Fertilizer <br />Mulch <br />application <br />`�'� �� <br />application <br />application <br />method: <br />method: <br />method: <br />
The URL can be used to link to this page
Your browser does not support the video tag.