My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-04-14_REVISION - M2002017
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2002017
>
2015-04-14_REVISION - M2002017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:13:02 PM
Creation date
4/14/2015 2:20:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002017
IBM Index Class Name
REVISION
Doc Date
4/14/2015
Doc Name
Request TR03
From
Lincoln County
To
DRMS
Type & Sequence
TR3
Email Name
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 Op COO <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />•* <br />1313 Sherman Street, Room 215, Denver, Colorado 80203 ph(303) 866 -3567 <br />} �s7s • <br />QUEST_ QR TECHNICAL REVISION (TR) COVER SHEET <br />File No.:M- 2002 -017 SiteName:O'DWYER PIT <br />county LINCOLN <br />TR# RECEIVED (DRMS Use only) <br />4�� Permittee: LINCOLN COUNTY APR 14 7015 <br />Operator (If Other than Permittee): 7=; WASION OF RECLAMATION <br />MINING N413 8ff ETY <br />Permittee Representative: J O H N D E W I TT <br />Please provide a brief description of the proposed revision: UPDATE MINING AND <br />RECLAMATION PLAN MAP TO MORE ACCURATELY DEFINE PERMIT BOUNDARY <br />USING GPS COODINATES. <br />As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application <br />which does not have more than a minor effect upon the approved or proposed Reclamation or <br />Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br />meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br />the Division may require the submittal of a permit amendment to make the required or desired changes <br />to the permit. <br />The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br />Division (as listed below by permit type). Please submit the appropriate fee with your request to <br />expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br />determine if it is approvable within 30 days. If the Division requires additional information to approve a <br />TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br />day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br />permittee requests additional time, in writing, to provide the required information. <br />There is no pre - defined format for the submittal of a TR; however, it is up to the permittee to provide <br />sufficient information to the Division to approve the TR request, including updated mining and <br />reclamation plan maps that accurately depict the changes proposed in the requested TR. <br />Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br />your request for a Technical Revision. <br />Permit Type Required TR Fee Submitted (mark only one) <br />1 IOc, 111, 112 construction <br />materials, and 112 quarries $216 <br />112 hard rock (not DMO) <br />I I Od, 112d(1, 2 or 3) <br />AF & Report <br />N No Violations <br />$175 <br />$1006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.