Laserfiche WebLink
* r COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />* 87 * 1313 Sherman Street, Room 215, Denver Colorado 80203 ph (303) 866 -3567 <br />104- REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br />File No.: M- 2001 -0 1 0 Site Name: Allison Pit <br />County Elbert <br />TR# (DRMS Use only) <br />Permittee: Elbert County RECIEWE <br />Operator (If Other than Permittee): APR n 1 HI i,�, <br />Permittee Representative: Ted Dole, Lynne Eschbach DNiS!GN OF RECLAMA7IUN <br />MINING AND SAFETY <br />Please provide a brief description of the proposed revision: <br />Adding additional drainage area to the southeast corner to drain the pit area when we lower <br />pasture above. <br />As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br />which does not have more than a minor effect upon the approved or proposed Reclamation or <br />Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br />meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br />the Division may require the submittal of a permit amendment to make the required or desired changes <br />to the permit. <br />The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br />Division (as listed below by permit type). Please submit the appropriate fee with your request to <br />expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br />determine if it is approvable within 30 days. If the Division requires additional information to approve a <br />TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br />day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br />permittee requests additional time, in writing, to provide the required information. <br />There is no pre - defined format for the submittal of a TR; however, it is up to the permittee to provide <br />sufficient information to the Division to approve the TR request, including updated mining and <br />reclamation plan maps that accurately depict the changes proposed in the requested TR. <br />Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br />your request for a Technical Revision. <br />Permit Type Required TR Fee Submitted (mark only one) <br />1 IOc, 111, 112 construction <br />materials, and 112 quarries $216 <br />112 hard rock (not DMO) <br />110d, 112d(l, 2 or 3) <br />J AF & Report <br />v No Violations <br />$175 <br />$1006 <br />