My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-16_REPORT - M1977342
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977342
>
2015-03-16_REPORT - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:58:25 PM
Creation date
3/23/2015 9:20:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
REPORT
Doc Date
3/16/2015
Doc Name
Annual Report Fee Map
From
Climax Molybdenum Company
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br />MAR 16, 2015 <br />1D1V1SiQ,+ for P.YcCLl'+MATIC <br />,N1 I EItA <br />E MAP <br />Permittee Name: Climax of bde <br />operation Name: Henderson Mine <br />Annual Fee Due: $1,150.00 <br />Permit Acreage: 11,877.50 <br />112d -3 Annual Report <br />Permit Number: <br />Anniversary Date: <br />Current Bond Amt: <br />M -1977 -342 <br />Clear Creek <br />March 8, 20 <br />$10,354,051.00 <br />Page 2 of 3 <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). YE NO <br />Mo+ktd per 3.1.12 (3), As apoproveo by 0RM$ on 7/W/111. <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). ES NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? N/A <br />5. Does the mine operate more than 180 days per year ES NO <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? YES <br />b) approval for INTERMITTENT OPERATION? YES `E3' <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). / / 7 <br />8. Number of acres that were newly affected during the current report year. O <br />9. Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />12. Total acres in various sta es of reclamation, since pe rmitted mining activities be an: <br />Total acres Total acres Total acres Total acres <br />backfilled: 0 seeded w/ C) w /topsoil 0 mulched w/ O <br />approved mix: replaced: approved mulch: <br />Total acres Total acres Topsoil Mulch application <br />graded: Q fertilized w/ O replacement 0 rate (tons): 0 <br />apvd fertilizer: depth (in.): <br />Seed Fertilizer Mulch <br />application application application <br />method: method: method: <br />
The URL can be used to link to this page
Your browser does not support the video tag.