Laserfiche WebLink
BLM Colorado, Royal Gorge Field Office <br />43 CFR 3809 Minerals Inspection /Site Visit <br />General Information <br />RECEIVED <br />MAR 0 << 2015 <br />DIVISION OF RECLAMATION <br />MINING AND SAFETY <br />Date <br />9/22/2014 <br />Time Onsite <br />11:00 - 12:00 pm <br />Project Name <br />Lee Placer #2 <br />Project Location <br />Gilpin Count <br />Project Status <br />Active <br />Project T e <br />Locatable Plan of Operations Level on un atented Claim <br />Occupancy Status <br />None <br />Operator <br />Thomas Musch <br />Case No. <br />COC 052022 <br />Inspection Purpose <br />General <br />Attendees <br />Bridgette Miller -BLM <br />Stephanie Carter - BLM <br />Recommended Action(s) <br />Michael Cunningham - DRMS <br />Date inspection shared with <br />Thomas Musch - Operator <br />CDRMS /O erator <br />Insnection Results <br />In conformance with 43 <br />Yes <br />CFR 3809.420? <br />Mining in conformance with <br />Yes <br />Notice/Plan requirements? <br />Reclamation in conformance <br />with Notice and /or Plan <br />Yes <br />requirements? <br />Hazardous materials /waste <br />No <br />onsite? <br />Go ahead and reclaim the prospect areas that were discussed during the inspection. <br />Instructions to Operator <br />Per both agencies, a formal succession of operator needs to be filed if Stanley Connor is <br />Recommended Action(s) <br />no longer involved. <br />Date inspection shared with <br />CDRMS /O erator <br />Inspection Comments <br />Mr. Musch pointed out the places that people had been prospecting outside of his claim boundary and also on his <br />claim. He said that he would reclaim that area soon with a backhoe. <br />Operator pointed out that the work of putting a large rectangular culvert in by a private land owner upstream from <br />him is the cause for the murky water. <br />Page 1 of 4 <br />