Laserfiche WebLink
-0#,A- <br />RECEIVED <br />FEB t r ?x315 <br />G8 R,Y� � <br />112c Annual Report <br />Page 2 of 3 <br />Permittee Name: <br />Flat To Flagstone, LLC <br />Permit Number: <br />M- 1997 -098 <br />Operation Name: <br />Flag Creek Mine <br />County: <br />Rio Blanco <br />Annual Fee Due: <br />$791.00 Anniversary Date: <br />March 30, 2015 <br />Permit Acreage: <br />140.00 Current Bond Amt: <br />$115,300.00 <br />According to C.R.S. 34-32.5-116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator- shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. if; while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). <br />3. is the mine site in final reclamation (all material extraction and stockpile removal is complete)? <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />5. Does the mine operate more than 180 days per year? <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation) <br />8. Number of acres that were newly affected during the current report year. <br />9. Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />1 1. Estimated acres to be reclaimed in the next report year. <br />12. Total acres in various stages of reclamation, since permitted minin <br />Total acres Total acres EWTI, tal acres <br />backfilled: seeded w/ topsoil <br />approved mix: '�� nlar a�i <br />Total acres <br />Total acres <br />graded: <br />p� fertilized w/ <br />N <br />apvd fertilizer: <br />eed <br />Fertilizer <br />:application <br />0( application <br />ethod: <br />j0 method: <br />activities <br />Topsoil <br />replacement depth (in.): , <br />YES NO <br />YES NO <br />YES NO <br />la <br />�-U <br />Y1�S NO <br />YES <br />YES <br />RA— <br />an: <br />Total acres <br />mulched w/ <br />approved mulch: <br />Mulch application <br />rate (tons /ac): <br />Mulch <br />application <br />method: <br />r <br />[a <br />