Laserfiche WebLink
1 (15p. D'+e 1/16/11-1 <br />(@ �7 --- I <br />�19fi&M E&CtTIC 11OCiation <br />P.O. Box 57, 1300 South Interocean 970 - 854 -2236 <br />Holyoke, Colorado 80734 Fax: 970 - 854 -3652 <br />January14, 2015 <br />Jeff Sprague <br />55184 CR ZZ <br />Yuma, CO 80759 <br />Jeff: <br />1' "77t19R'D <br />FEB 2 0 2015 <br />Division of RedmmdM <br />UiniV & Sakty <br />Highline Electric Association (HEA) has reviewed the potential impacts on HEA power line facilities from the <br />installation and operation of a gravel pit facility to be located in the SW of Section 25 Township 05N Range <br />49W of the 61h PM, Washington County. The mining and reclamation activities as proposed will remain at least <br />50 ft. from HEA infrastructure and therefore will have no negative effect on the operation and maintenance for <br />the power line facility structures. Please contact me to discuss this matter further or for any additional <br />information you may require. <br />Acknowledged by: <br />Trent Loutensock <br />Mgr. of Engineering <br />STATE OF COLORADO) <br />) ss. <br />COUNTY OF PHILLIPS) <br />The foregoing was acknowledged before me this 14th day of January, 2015. <br />/ OENNIS E HERMAN <br />STATE OF COLOLRADO <br />NOTARY ID 20044039972 <br />"f'"MUISSION EXPIRES 11/0414016 <br />Your Touchstone Energ� Partner <br />