Laserfiche WebLink
�.ov C�<0�9 COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />N� o, MINERALS PROGRAM INSPECTION REPORT <br />`. .` PHONE: (303) 866 -3567 <br />1876 <br />The Division of Reclamation, Mining and Safety has conducted an inspection of the mining operation <br />noted below. This report documents observations concerning compliance with the terms of the permit <br />and applicable rules and regulations of the Mined Land Reclamation Board. <br />MINE NAME: <br />MINE /PROSPECTING ID #: <br />MINERAL: <br />COUNTY: <br />Simla Highway Pit <br />M -1995 -095 <br />Borrow material for construction <br />El Paso <br />INSPECTION TYPE: <br />INSPECTOR(S): <br />INSP. DATE: <br />INSP. TIME: <br />Monitoring <br />Timothy A. Cazier <br />February 12, 2014 <br />12:00 <br />OPERATOR: <br />OPERATOR REPRESENTATIVE: <br />TYPE OF OPERATION: <br />Schuler Terracing <br />Henry Schuler <br />110c - Construction Limited Impact <br />REASON FOR INSPECTION: <br />BOND CALCULATION TYPE: <br />BOND AMOUNT: <br />Normal I &E Program <br />Partial Bond <br />$20,000.00 <br />DATE OF COMPLAINT: <br />POST INSP. CONTACTS: <br />JOINT INSP. AGENCY: <br />NA <br />None <br />None <br />WEATHER: <br />INSPECTOR'S SIGNS TURF, <br />SIGNATURE DATE: <br />Windy <br />r- 1 <br />February 5, 2015 <br />L.% <br />The followinu inspection topics were identified as having Problems or Possible Violations. OPERATORS <br />SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br />WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS. If a <br />Possible Violation is indicated, you will be notified under separate cover as to when the Mined Land <br />Reclamation Board will consider possible enforcement action. <br />INSPECTION TOPIC: Financial Warranty <br />PROBLEM /POSSIBLE VIOLATION: Problem: The current bond is inadequate for 9.9 acres of affected area. <br />CORRECTIVE ACTIONS: The Operator must request a surety reduction for reclamation performed or an acreage <br />release for reclamation completed on affected area where there is to be no more mining in an approvable form <br />by March 9, 2015. If neither of the required requests are received by the due date, the DRMS will request a <br />surety increase for the entire 9.9 acres. <br />CORRECTIVE ACTION DUE DATE: 3/09/15 <br />Page 1 of 7 <br />