Laserfiche WebLink
12/18/2014 State.co.us Executive Branch Mail - Fwd: Bowie No. 2 Gob Pile #1 Variance <br />1 message <br />Burgmaier - DNR, Susan <susan.burgmaier @state.co.us> Wed, Dec 17, 2014 at 10:30 AM <br />To: Tamme Bishop <tam me.jestover@bres nan. net>, Bill Bear <BBear @bowieresources.com> <br />Cc: Alysha Hernandez - DNR <alysha.hernandez @state.co.us >, Mary Rodriguez - DNR <br /><mary.rodriguez @state.co.us >, Marcia Talvitie - DNR <marcia.talvitie @state.co.us >, Daniel Hernandez - DNR <br /><daniel.hernandez@state.co.us> <br />Bill and Tamme - The Division received comments on TR -97 from MSHA indicating that the slopes of Gob Pile <br />#1 may not be modified until the proposed plan has been approved by the MSHA District Manager. MSHA has <br />requested a copy of the plan for their review. Please provide MSHA with a complete copy of the revision <br />application materials and copy the Division on the transmittal. MSHA will accept an electronic copy of the <br />revision. <br />Susan L. Burgmaier <br />a <br />P 303.866.3567 <br />1313 Sherman Street, Room 215, Denver, CO 80203 <br />Susan, <br />Thank you for the information concerning Bowie No.2 Mine (MSHA ID 05- 04591) request to modify the slope of <br />Gob Pile #1 (MSHA ID No. 1211 -CO09- 04591 -01) refuse pile. <br />MSHA District 9 in Denver has not received a construction plan modification from the Bowie No.2 Mine to <br />change the approved slope to Gob Pile #1. <br />The approved slope is 2H: 1V as required by 30 CFR § 77.215(h) <br />Therefore the slope cannot be modified until a plan has been submitted and approved by the District Manager. <br />Please contact me or Sid Hansen at 303 - 231 -5453 if you have any questions. <br />Thanks <br />https: / /mail.googl e.com /m ai I /u/0 / ?ui =2 &i k= e29129fcb5 &view =pt &search= i nbox &th= 14a594de681280a1 &si m l= 14a594de681280a1 1/2 <br />